Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation

Barrack Demolition

W911S226QA019

Department of the Army, W6QM Micc-Ft Drum. Site Preparation Contractors.

Response deadline

June 15, 2026 at 10:00 AM EDT

Closed 139 days ago. Posted June 9, 2026, first published May 5, 2026. Scheduled to archive June 9, 2027.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2026

9 like it are open now in site preparation contractors

All 9 open in site preparation contractors

Description

As published on SAM.gov.

Amendment 0005 to add Questions and Answers, Attachment 18_ECS-000 - Construction Plans - Specifications and As-built Record Drawings, Attachment 19_BDA-Aviation-II-As-Built-Drawings-vol-1, and update PWS Paragraph 5.3.1 from (5.3.1. The BRK facilities, 1-25 are two story structures that are approximately 28-7 in height and approximately 97-4 in width, with metal siding and roofing panels. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a concrete slab on grade mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 3, 4 and 5 for structural information) to (5.3.1. The BRK Facilities 1 through 25 are two-story structures measuring approximately 97?4 wide, 33 long, and 28?7 high. Constructed with metal siding and roofing, each facility is built on a 4,400 sq ft concrete slab. There is an attached pressure-treated deck providing entrance to the first level, which contains a laundry room, two kitchenettes, two bathrooms, six bedrooms, stairwell and a mechanical room with exterior access only. The second level mirrors the first with the only exception being there is interior access to the mechanical room. Each level is approximately 3,168 sq ft. Refer to attachments 1, 2 and 3 for structural information.)

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 5, 2026

    Combined synopsis and solicitation

    Due May 27, 2026 at 10:00 AM EDT. SAM.gov, notice af73d1e65885494190ea5ba360862554

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation
  2. May 21, 2026

    Combined synopsis and solicitation

    Due June 2, 2026 at 10:00 AM EDT. SAM.gov, notice fb6f6eac08f8495aa8b6f206e0217ff1

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation
  3. June 1, 2026

    Combined synopsis and solicitation

    Due June 2, 2026 at 10:00 AM EDT. SAM.gov, notice 4a57ef29f82f4d12b54fc7474e608f24

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation
  4. June 2, 2026

    Combined synopsis and solicitation

    Due June 8, 2026 at 10:00 AM EDT. SAM.gov, notice 58d8a37914184a85a054798af9aa7632

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation
  5. June 8, 2026

    Combined synopsis and solicitation

    Due June 15, 2026 at 10:00 AM EDT. SAM.gov, notice 833a20f6b67b4abdbc22765398ea4c75

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation
  6. June 9, 2026

    Combined synopsis and solicitation

    Due June 15, 2026 at 10:00 AM EDT. SAM.gov, notice 9d9594d111524a179436c52a4dc76afa

    6 revisions on SAM
    • June 9, 2026: publish, combined synopsis and solicitation
    • June 8, 2026: publish, combined synopsis and solicitation
    • June 2, 2026: publish, combined synopsis and solicitation
    • June 1, 2026: publish, combined synopsis and solicitation
    • May 21, 2026: publish, combined synopsis and solicitation
    • May 5, 2026: publish, combined synopsis and solicitation

Points of contact