Combined synopsis and solicitation, total small business set-aside
Prefabricated Rail Timber Crossing Panels
W911S225U0731
Department of the Army, W6QM Micc-Ft Drum. All Other Transportation Equipment Manufacturing.
Response deadline
May 27, 2025 at 11:00 AM EDT
Closed 524 days ago. Posted May 21, 2025, first published May 20, 2025. Scheduled to archive May 20, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
1 like it is open now in all other transportation equipment manufacturing
- Two new 2027 mountain snowmobiles for Hebgen Lake Ranger District.
Forest Service, Usda-Fs, Csa Northwest 3
Combined synopsis and solicitationNAICS 336999Anywhere in the US1240BE27Q0010Closes in 8 daysNov 10
Description
As published on SAM.gov.
Prefabricated Timber Crossing Panels for 11 rail crossings. Prefabricated panels are required for Maintenance-of-Way personnel to replace cross-ties under the rail crossings. The cross-ties hold the track in gauge (56-1/2 inches). Panels must be fit for 100-lb RE rail placed on 10-ft cross-ties. Prefabricated Timber Crossing Pannels should be full depth creosote-treated hardwood timber crossing panels used in railroad crossings. The timber panels layover the rail and ties to let passenger vehicles cross.
The panels require detailed cuts, notching, beveling, and drilling to perfectly fit inside the rail gauge and outside on the rail field side. The timbers shall be primarily oak and with some mixed hardwoods allowed. The standard creosote retention for railroad timbers is 7 pounds per cubic foot (pcf) for oak, hickory, or mixed hardwoods. Creosote protects against decay fungi and insects, and restores the wood's natural elasticity.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Kevin Harpkevin.m.harp.civ@army.mil5716448800
- Joy Davisjoy.l.davis18.civ@army.mil3157729900