Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, 8(a) set-aside, first published as presolicitation

EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA

W911KB25RA010

Department of the Army, W2SN Endist Alaska. Commercial and Institutional Building Construction.

Response deadline

May 2, 2025 at 4:00 PM EDT

Closed 548 days ago. Posted July 31, 2025, first published March 7, 2025. Scheduled to archive April 24, 2026.

Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities

This one closed in 2025

184 like it are open now in commercial and institutional building construction

All 184 open in commercial and institutional building construction

Description

As published on SAM.gov.

THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION.

THE THREE CONTRACTORS ARE AS FOLLOWS:

BRISTOL BUILDING CONSTRUCTORS, LLC RED POINT CONSTRUCTION, LLC STG PACIFIC, LLC

This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced.

The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator.

30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 7, 2025

    Presolicitation

    REPLACE GENERATORS, CHPP, EIELSON AIR FORCE BASE, ALASKA (EIE488)

    Due March 22, 2025 at 6:00 PM EDT. SAM.gov, notice 3b677291a12642859e88965d49dafb67

  2. March 26, 2025

    Solicitation

    Due April 25, 2025 at 7:00 PM EDT. SAM.gov, notice 52149baac3044f36916ffa8f371a2fa9

  3. April 18, 2025

    Solicitation

    Due May 2, 2025 at 5:00 PM EDT. SAM.gov, notice 18d93ce192c0464b9fcc4cbe771ae22b

  4. April 24, 2025

    Solicitation

    Due May 2, 2025 at 5:00 PM EDT. SAM.gov, notice 673675df37454602b9849c605e9f20af

  5. July 31, 2025

    Solicitation

    Due May 2, 2025 at 4:00 PM EDT. SAM.gov, notice 2b73af669fc8449b88ffbe6cbf503024

Points of contact