# EIE488 - REPLACE GENERATORS AT CHPP, EIELSON AIR FORCE BASE, ALASKA

Canonical: https://abierto.us/opportunities/w911kb25ra010

- Solicitation number: W911KB25RA010
- Notice type: Solicitation (first published as presolicitation)
- Status: Closed. Deadline was May 2, 2025 at 4:00 PM EDT
- Department: Department of the Army
- Agency: Department of the Army
- Contracting office: W2SN Endist Alaska (W911KB)
- NAICS: 236220 Commercial and Institutional Building Construction
- Product or service code: Y1PZ Construction Of Other Non-Building Facilities
- Set-aside: 8(a) set-aside
- County: Fairbanks North Star Borough (FIPS 02090). https://abierto.us/counties/fairbanks-north-star-borough-ak-02090
- City: Eielson AFB. https://abierto.us/cities/eielson-afb-ak-0221370
- First posted: March 7, 2025
- Last posted: July 31, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/2b73af669fc8449b88ffbe6cbf503024/view

## Description

THIS IS TO IDENTIFY THE CONTRACTORS SELECTED TO MOVE TO PHASE 2 FOR THIS ACQUISITION.

**THE THREE CONTRACTORS ARE AS FOLLOWS:**

BRISTOL BUILDING CONSTRUCTORS, LLC RED POINT CONSTRUCTION, LLC STG PACIFIC, LLC

This is a Design Build project to design and replace the existing four 1,500 kW standby generators and associated electrical equipment that provide primary power to the Eielson Air Force Base (EAFB) Power Plant Building B6203. The two bulk fuel storage tanks are to remain but are required to be inspected and a status report provided, detailing any concerns, issues and deficiencies. The bulk fuel tank fuel gauge equipment is not functioning and must be replaced.

The signage for the generators and bulk fuel storage tanks must be replaced. Contractor must maintain a minimum of 4,500kW (standby rated) power and 4,095kW (Prime rated) power available for the site and power plant from April 15th through September 15th. The contractor must maintain a minimum of 3,000kW (standby rated) power and 2,730kW (Prime rated) power available for the site and power plant from May 1st to July 31st. All other times of the year the contractor is not allowed to shut down a generator.

30-day notification of anticipated electrical shutdowns are required. The contractor must provide construction phasing plan, schedule, and assumptions in the Engineering Considerations and Instructions for Field Personnel (ECIFP) Report and within the design drawings and specifications.

## Publications

- March 7, 2025: Presolicitation, due March 22, 2025 at 6:00 PM EDT. Notice 3b677291a12642859e88965d49dafb67. https://sam.gov/workspace/contract/opp/3b677291a12642859e88965d49dafb67/view
- March 26, 2025: Solicitation, due April 25, 2025 at 7:00 PM EDT. Notice 52149baac3044f36916ffa8f371a2fa9. https://sam.gov/workspace/contract/opp/52149baac3044f36916ffa8f371a2fa9/view
- April 18, 2025: Solicitation, due May 2, 2025 at 5:00 PM EDT. Notice 18d93ce192c0464b9fcc4cbe771ae22b. https://sam.gov/workspace/contract/opp/18d93ce192c0464b9fcc4cbe771ae22b/view
- April 24, 2025: Solicitation, due May 2, 2025 at 5:00 PM EDT. Notice 673675df37454602b9849c605e9f20af. https://sam.gov/workspace/contract/opp/673675df37454602b9849c605e9f20af/view
- July 31, 2025: Solicitation, due May 2, 2025 at 4:00 PM EDT. Notice 2b73af669fc8449b88ffbe6cbf503024. https://sam.gov/workspace/contract/opp/2b73af669fc8449b88ffbe6cbf503024/view

## Points of contact

- Mark Corn, mark.r.corn@usace.army.mil, 9077532817
- THERESA AFRANK, THERESA.M.AFRANK@USACE.ARMY.MIL, 9077532739

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/w911kb25ra010.