Presolicitation, first published as sources sought
Caño Martin Peña Ecosystem Restoration, Contract 3 Phase 1
W51DQV25R0006_
Department of the Army, W2SR Endist Caribbean. Other Heavy and Civil Engineering Construction.
Response deadline
April 8, 2025 at 4:00 PM EDT
Closed 528 days ago. Posted April 2, 2025, first published December 4, 2024. Scheduled to archive April 23, 2025.
Description
As published on SAM.gov.
Due to the new Army Contract Writing System this Pre-solicitation is being amended. The only change to note is the Solicitaion number W51DQV25R006 (Orginal Solicitation Number) will be changed to W51DQV25RA004 (New Solicitatioin number) when published in the near future. Please continue to monitor the website for the " New Solicitation Number" W51DQV25RA004.
Description The Caribbean District, USAC Corps of Engineers intends to issue a Request for Proposal (RFP) to award a Firm-Fixed Price (FFP) Stand-Alone Construction Contract.
This requirement is for Caño Martin Peña Ecosystem Restoration Contract Phase 1 that will include; the site development of Ciudad Deportiva Roberto Clementé for Material Management Area; preparation of the aquatic disposal pits at San José Lagoon (SJL); dredging of 3,000 meters-long access channel across SJL; bridge fenders to protect the concrete piers of the Moscoso Bridge near the SJL access channel; dredging of 450 meters-long transition channel between main channel and SJL access channel; dredging of 900 meters-long main channel (30.48 meters wide x 3.05 meters deep) from the Barbosa bridge to San Jose Lagoon transition channel including steel sheet pile walls with concrete cap, and natural bottom; and construction of an approximately 61 meters-long riprap channel at the Barbosa Bridge to protect the foundation from scour.
The contract will be awarded using the procedures outlined in Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation. Award will be made to the offeror whose proposal conforms to the solicitation and has been evaluated as the most advantageous to the Government, all factors considered. All responsive proposals will be evaluated utilizing the following factors:
(1) Technical Approach;
(2) Past Performance; and (3) Price. E. Award may not necessarily be made to the lowest priced offeror. The Solicitation Documents will be available on or about April 8, 2025, online at https://www.sam.gov. To be eligible for contract award, an offeror must be registered in the System for Award Management (SAM). Register via the SAM website at https://www.sam.gov as well as the Procurement Integrated Enterprise Environment (PIEE) at https://PIEE.eb.mil. The PIEE system will be utilized to submit the proposal. Range of Magnitude (ROM) is between $25,000,000.00 and $100,000,000.00.
Period of Performance: 1363 calendar days from Notice to Proceed. A NAICS Code of 237990 - Other Heavy and Civil Engineering Construction, has been established for this solicitation with a size standard of $45 million in average annual receipts. THIS IS AN UNRESTRICTED ACQUISITION. ALL RESPONSIBLE CONTRACTORS ARE ENCOURAGED TO PARTICIPATE. Questions may be submitted to Samuela Adams, Contract Specialist at Samuela.y.adams@usace.army.mil and Katrina Chapman, Contracting Officer at katrina.l.chapman@usace.army.mil.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 4, 2024
Sources sought
Caño Martin Peña Ecosystem Restoration Project
Due January 3, 2025 at 10:00 AM EST. SAM.gov, notice e2562a30b31f4e938bb3881bc6f2235d
March 14, 2025
Presolicitation
Caño Martin Peña Ecosystem Restoration Contract 3, Phase 1
Due March 31, 2025 at 5:00 PM EDT. SAM.gov, notice adf24b43468942b080e11f0bd28d105b
March 14, 2025
Presolicitation
Caño Martin Peña Ecosystem Restoration Contract 3, Phase 1
Due March 31, 2025 at 5:00 PM EDT. SAM.gov, notice f1c2f917a73249beac55f57673e4e273
March 20, 2025
Presolicitation
Due April 8, 2025 at 4:00 PM EDT. SAM.gov, notice 5064fbb136c94b29b9faa1d7afd1879d
March 27, 2025
Presolicitation
Due April 8, 2025 at 4:00 PM EDT. SAM.gov, notice 036f736ab23345d985162cf35122196f
March 27, 2025
Presolicitation
Due April 8, 2025 at 4:00 PM EDT. SAM.gov, notice 665bfbfaebfe447c9ab1557c3481ae67
April 2, 2025
Presolicitation
Due April 8, 2025 at 4:00 PM EDT. SAM.gov, notice c6a67e453813464cb674ebe6bd8e69e1