Combined synopsis and solicitation, total small business set-aside
Upgrade UPS & Cooling System
W50S8W-26-Q0001
Department of the Army, W7N9 Uspfo Activity Wyang 153. All Other Miscellaneous Electrical Equipment and Component Manufacturing.
Response deadline
June 30, 2026 at 12:00 PM EDT
Closed 124 days ago. Posted June 1, 2026. Scheduled to archive July 15, 2026.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2026
57 like it are open now in all other miscellaneous electrical equipment and component manufacturing
- POWER SUPPLY
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationHUBZoneNAICS 335999Anywhere in the USSPE7L727T0354Closes in 2 daysNov 2 - INTERCONNECTING BOX
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE4A727T1998Closes in 2 daysNov 2 - WIRING HARNESS,BRAN
Defense Logistics Agency, DLA Aviation
Combined synopsis and solicitationSmall businessNAICS 335999Anywhere in the USSPE4A627T6534Closes in 2 daysNov 2
All 57 open in all other miscellaneous electrical equipment and component manufacturing
Description
As published on SAM.gov.
The vendor shall provide un-installation of outdated equipment
and installation of brand-new items according to acceptable standards. Contractor
shall provide Uninterruptible Power and Cooling Distribution Unit replacement/
installation and a Site Lead/Project Manager to provide the following critical tasks to
support to the WYANG per the PWS.
• 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid.
• 5.3.4 Demo existing piping
• 5.3.5 Run new Pex piping to the in-row coolers.
• 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure.
Tie existing EPO into new Shunt Trip breaker.
• 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown &
locked out. Intercept existing Feeder to line side of new 350A Shunt Trip
Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt
Trip Breaker to new UPS.
• 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old
UPS.
• 5.3.9 Install Power Modules and Battery Cabinets
• 5.3.10 Assume the existing structural integrity of raised floor is sufficient to
move old UPS across floor & new UPS installed at old UPS location. All
raised floor modifications by others.
SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED.
QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- B.08 CS UPS & COOLING SYSTEM - Combo (26-Q-0001).pdf173 KB, June 1, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 1, 2026
Combined synopsis and solicitation
Due June 30, 2026 at 12:00 PM EDT. SAM.gov, notice 19c2cdaeea8d4412b55ebdc452e10d69
2 revisions on SAM
- June 9, 2026: publish, combined synopsis and solicitation
- June 1, 2026: publish, combined synopsis and solicitation
Points of contact
- Kristopher W Kahlekristopher.kahle@us.af.mil307-772-6887