{"canonical":"https://abierto.us/opportunities/w50s8w26q0001","key":"W50S8W26Q0001","url":"https://abierto.us/opportunities/w50s8w26q0001","title":"Upgrade UPS & Cooling System","solicitation_number":"W50S8W-26-Q0001","notice_type":"k","open":false,"response_deadline":"2026-06-30T16:00:00Z","first_posted":"2026-06-01","last_posted":"2026-06-01","department":"DEPT OF DEFENSE","subagency":"DEPT OF THE ARMY","office":"W7N9 USPFO ACTIVITY WYANG 153","naics":"335999","psc":"6150","set_aside":"SBA","place_state":"WY","place_county":"56021","place_county_name":"Laramie County","place_city":"5613900","place_city_name":"Cheyenne","winner":null,"award_amount":null,"publications":[{"notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","title":"Upgrade UPS & Cooling System","solicitation_number":"W50S8W-26-Q0001","notice_type":"k","base_type":"k","posted":"2026-06-01","posted_at":null,"due_at":"2026-06-30T16:00:00Z","due_date":"2026-06-30","cancelled":null,"archived":null,"archive_date":"2026-07-15","award_number":null,"awardee_name":null,"amount":null,"link_sam":"https://sam.gov/workspace/contract/opp/19c2cdaeea8d4412b55ebdc452e10d69/view","enriched":false,"history":[]}],"latest_notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","first_type":"k","notices":[{"dates":{"posted":"2026-06-01","response_deadline":{"raw":"2026-06-30T10:00:00-06:00","utc":"2026-06-30T16:00:00Z","date":"2026-06-30","time":"10:00:00","utc_offset_seconds":-21600}},"links":{"sam":"https://sam.gov/workspace/contract/opp/19c2cdaeea8d4412b55ebdc452e10d69/view"},"naics":{"codes":["335999"],"primary":"335999"},"title":"Upgrade UPS & Cooling System","agency":{"office":{"code":"W50S8W","name":"W7N9 USPFO ACTIVITY WYANG 153"},"subtier":{"code":"2100","name":"DEPT OF THE ARMY"},"department":{"code":"021","name":"DEPT OF DEFENSE"},"office_address":{"zip":"82009-4799","city":"CHEYENNE","state":"WY","country":"USA"},"organization_type":"OFFICE"},"status":{"active":false,"archive_date":"2026-07-15","archive_type":"auto15"},"contacts":[{"name":"Kristopher W Kahle","role":"primary","email":"kristopher.kahle@us.af.mil","phone":"307-772-6887"}],"base_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","set_aside":{"code":"SBA","label":"Total Small Business Set-Aside (FAR 19.5)"},"provenance":{"extract":{"url":"https://s3.amazonaws.com/falextracts/Contract%20Opportunities/Archived%20Data/FY2026_archived_opportunities.csv","etag":"\"d9374b90a938e9923d910594731b7b57-106\"","fetched_at":"2026-09-16T16:22:53.920682Z","row_sha256":"96ee850aec08e20f302b4a144eb8bc5f1c63424c471a11120b636e648037547f","last_modified":"2026-09-13T14:50:39Z"},"updated_at":"2026-09-16T16:22:53.920682Z","first_seen_at":"2026-09-16T16:22:53.920682Z"},"description":{"text":"The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. • 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. • 5.3.4 Demo existing piping • 5.3.5 Run new Pex piping to the in-row coolers. • 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. • 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. • 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. • 5.3.9 Install Power Modules and Battery Cabinets • 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT","origin":"extract"},"notice_type":{"code":"k","label":"Combined Synopsis/Solicitation"},"schema_version":1,"solicitation_number":"W50S8W-26-Q0001","place_of_performance":{"zip":"82009","city":{"name":"Cheyenne"},"state":{"code":"WY"},"country":{"code":"USA"}},"product_service_code":"6150"}],"due_at":"2026-06-30T16:00:00Z","due_date":"2026-06-30","closes_at":"2026-06-30T16:00:00Z","awardable":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W50S8W","office_name":"W7N9 USPFO ACTIVITY WYANG 153","state":"WY","county":"56021","county_name":"Laramie County","city":"5613900","city_name":"Cheyenne","country":"USA","winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z","principal_notice_id":"19c2cdaeea8d4412b55ebdc452e10d69","description":{"text":"The vendor shall provide un-installation of outdated equipment and installation of brand-new items according to acceptable standards. Contractor shall provide Uninterruptible Power and Cooling Distribution Unit replacement/ installation and a Site Lead/Project Manager to provide the following critical tasks to support to the WYANG per the PWS. • 5.3.3 Capture existing cooling fluid/Re-fill system with cooling fluid. • 5.3.4 Demo existing piping • 5.3.5 Run new Pex piping to the in-row coolers. • 5.3.6 Furnish & install new 350A shut Trip Breaker with nema-1 Enclosure. Tie existing EPO into new Shunt Trip breaker. • 5.3.7 Existing 3” Feeder conduit & wire fed from MDP will be shutdown & locked out. Intercept existing Feeder to line side of new 350A Shunt Trip Breaker/Enclosure. Install Load side Feeder conduit & wire from new Shunt Trip Breaker to new UPS. • 5.3.8 Demo existing UPS, remove from Data Center, Dispose/recycle old UPS. • 5.3.9 Install Power Modules and Battery Cabinets • 5.3.10 Assume the existing structural integrity of raised floor is sufficient to move old UPS across floor & new UPS installed at old UPS location. All raised floor modifications by others. SITE VISIT: 10 JUNE 2026 AT 1300 MDT at 217 Dell Range Blvd, Cheyenne, WY 82009 - IF NO REQUEST FOR SITE VISIT ARE RECIEVED BY 08 JUNE 2026 AT 1200 MDT, IT WILL BE CANCELED. QUESTIONS DUE: 12 JUNE 2026 AT 1000 MDT","html":null,"origin":"extract"},"contacts":[{"name":"Kristopher W Kahle","role":"primary","email":"kristopher.kahle@us.af.mil","phone":"307-772-6887"}],"place_of_performance":{"zip":"82009","city":{"name":"Cheyenne"},"state":{"code":"WY"},"country":{"code":"USA"}},"office_address":{"zip":"82009-4799","city":"CHEYENNE","state":"WY","country":"USA"},"naics_codes":["335999"],"award":null,"attachments":[],"awards":[],"related":[{"key":"W50S8W26RA003","latest_notice_id":"263cffa4dd4948ce8d3680b4a632fcb6","title":"CES - MAU Coil","solicitation_number":"W50S8W26RA003","notice_type":"o","first_type":"o","first_posted":"2026-09-09","last_posted":"2026-09-09","notices":1,"due_at":"2026-09-19T16:00:00Z","due_date":"2026-09-19","closes_at":"2026-09-19T16:00:00Z","awardable":true,"open":true,"dept_key":"d-021","dept_name":"DEPT OF DEFENSE","sub_key":"s-2100","sub_name":"DEPT OF THE ARMY","office_key":"o-W50S8W","office_name":"W7N9 USPFO ACTIVITY WYANG 153","naics":"236220","psc":"Z2BZ","set_aside":"SBA","state":"WY","county":"56021","county_name":"Laramie County","city":"5613900","city_name":"Cheyenne","country":"USA","winner":null,"winner_key":null,"amount":null,"linked_awards":0,"cancelled":false,"archived":false,"updated_at":"2026-09-16T21:18:12.857524Z"}]}