Combined synopsis and solicitation, total small business set-aside
165 SFS - IDS Phase 3 Repairs
W50S7025RA003
Department of the Army, W7M3 Uspfo Activity Gaang 165. Electrical Contractors and Other Wiring Installation Contractors.
Response deadline
September 26, 2025 at 1:00 PM EDT
Closed 404 days ago. Posted September 23, 2025, first published September 23, 2025. Scheduled to archive September 30, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in electrical contractors and other wiring installation contractors
- Airfield Lighting Computer System
Department of the Air Force, FA4800 633 Cons PKP
SolicitationNAICS 238210VirginiaFA480027Q00001Closes todayNov 4 - FY27 Remove/Install Two (2) Commercial-Grade Laser/LED Projectors
Department of Veterans Affairs, 248-Network Contract Office 8
SolicitationSmall businessNAICS 238210Anywhere in the US36C24827Q0036Closes todayNov 4 - Air Compressor Relocation
Department of the Navy, Naval Research Laboratory
Combined synopsis and solicitationSmall businessNAICS 238210Washington, DCN0017326Q1905Closes todayNov 4
All 36 open in electrical contractors and other wiring installation contractors
Description
As published on SAM.gov.
The project addresses identified deficiencies in device functionality, system configuration, and overall system architecture to improve security, reliability, and operational efficiency. The project includes device replacements, system reconfigurations, and cleanup/optimization tasks.
Project Goals:
- Restore full functionality to all identified malfunctioning access control points.
- Optimize system architecture for improved performance, redundancy, and ease of management.
- Centralize key system components for enhanced monitoring and control.
- Streamline badge issuance and enrollment processes.
- Ensure accurate and consistent system time across all components.
- Properly configure ACS panels for Portal SEC/ACC integration.
Please utilize the attached solicitation and supporting documentation in completing your quote.
*PLEASE NOTE: PLEASE COMPLETE THE ATTACHED DOCUMENT - W50S7025RA003 along with providing any supporting documentation showing technical capability and proposed equipment.
*This is a brand-name requirement.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment_1_165_SFS_Phase_3_PWS.pdf243 KB, September 23, 2025
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 23, 2025
Combined synopsis and solicitation
Due September 26, 2025 at 1:00 PM EDT. SAM.gov, notice 86350244fbe24a00832c97d8606051d0
2 revisions on SAM
- September 23, 2025: publish, combined synopsis and solicitation
- September 23, 2025: publish, combined synopsis and solicitation
September 23, 2025
Combined synopsis and solicitation
Due September 26, 2025 at 1:00 PM EDT. SAM.gov, notice e7b3879a2580419fa10fe095ccb53df5
2 revisions on SAM
- September 23, 2025: publish, combined synopsis and solicitation
- September 23, 2025: publish, combined synopsis and solicitation
Points of contact
- Justin SmithJustin.Smith.173@us.af.mil9129668272
- ANDREW SMITHANDREW.SMITH.261@US.AF.MIL9129633352