Combined synopsis and solicitation, total small business set-aside
LRAFB B118 Flooring Replacement
W50S6P24QA012
Department of the Army, W7MW Uspfo Activity Arang 189. Flooring Contractors.
Awarded
$34,700.00 obligated so far on USAspending
Description
As published on SAM.gov.
AMENDMENT 1: 21 August 2024 This RFQ is amended to include Questions and Answers and the PWS was edited, changes noted below. All other aspects of the RFQ remain the same. Quotes due by 30 August, 2024 3:00pm CST.
Edits to PWS: Header edited to make clear contractor is responsible to provide all materials, equipment, and labor to complete the project. In the area outlined in orange on the floor plan, the requirement has been changed to:
remove ceramic tile and place New LVP (Tile Base to Remain). ORIGINAL The Contractor shall provide all management, tools, supplies, equipment, and labor necessary to perform all work in accordance with these specifications.
The general requirement for the project is to remove and dispose of all vinyl composition tile (VCT), ceramic tile, and floor base in the selected areas of Building 118, Little Rock AFB, and replace with new luxury vinyl planks (LVP), new transition strips, and new resilient floor base All flooring material will be contractor furnished. This general outline ofwork does not, in any way, limit the responsibility ofthe Contractor to perform all work as specified herein. The new LVP is a brand name requirement. Brand Name Justification is attached.
NOTE: When submitting your quote, the Government will award a contract to the responsible offeror whose quote conforms to the solicitation and is the most advantageous to the Government, price and other factors considered. Factors being utilized to evaluate offers are:
1. Lowest Price: Complete Price Schedule on the Attachment titled: Combined Synopsis-Solicitation • Submit offer/quote IAW the Performance Work Statment (PWS) Quotes shall be submitted via email to the following addresses ryan.bernaiche@us.af.mil no later than 3:00 PM CST, 30 August 2024 in order to be considered timely. Questions are due no later than 3:00 PM CST, 16 August 2024. The Government is not obligated to answer any questions submitted after the deadline.
It is the vendor’s responsibility to monitor the solicitation posted herein for amendments issued in reference to this requirement. Any potential amendments will be posted in the same fashion as the solicitation. All Contractors who provide goods/services to the DoD must be registered in the System for Award Management (SAM). Failure to comply with SAM registration will deem the Offeror ineligible for award.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- White River Flooring, Inc.
- UEI
- CTY7R3KVGFD3
- CAGE
- 6ZAD8
- Vendor location
- Searcy, AR
- Contract
- W50S6P24PA007, purchase order
- Obligated
- $34,700.00
- Actions
- 1 between September 29, 2024 and September 29, 2024
- Competition
- Competed Under SAP, 16 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- B118 Flooring
- Match
- solicitation number W50S6P24QA012 equals the FPDS solicitation identifier; same awarding office W50S6P (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- TSgt Ryan J. Bernaicheryan.bernaiche@us.af.mil