Skip to content
  • 6,814 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought, total small business set-aside

Tinker Base Engineering Support Services (TBESS) Sources Sought

TBESS-SS-01

Department of the Air Force, FA8137 AFSC Pzioc. Engineering Services.

Response deadline

June 30, 2026 at 3:00 PM EDT

Closed 124 days ago. Posted August 4, 2026, first published June 12, 2026. Scheduled to archive August 15, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

94 like it are open now in engineering services

All 94 open in engineering services

Description

As published on SAM.gov.

July 2, 2026

Industry Day
July 22, 2026
See attached agenda for details
.

===================================================

Updated 18 June 2026

Attached correct version of PWS Draft.

17 June 2026

Draft PWS and Draft CDRLS have been uploaded for review.
Industry Day is being planned and will be announced at a later date.

==================================================================================================

1.0 BACKGROUND AND OBJECTIVE

The 72d Civil Engineer Directorate (72 ABW/CE) at Tinker Air Force Base (TAFB), Oklahoma, is seeking capability statements from qualified industry partners to provide comprehensive, cradle-to-grave engineering project management, execution, and technical support services. The objective of this acquisition is to secure an agile, innovative, and highly qualified engineering workforce to manage the installation's built infrastructure portfolio.

2.0 CONTRACT STRUCTURE & STRATEGIC INTENT

The Government anticipates an IDIQ contract utilizing both Firm-Fixed Price (FFP) and FFP Level of Effort (LOE) Contract Line Item Numbers (CLINs) to address baseline workload, surge capacity, and specialized workload as appropriate. A critical strategic imperative of this contract is the support of the Government’s long-term workforce and insourcing strategy. The successful offeror must be capable of providing comprehensive knowledge transfer, developing rigorous Standard Operating Procedures (SOPs), and seamlessly transitioning specific functions to Government performance over the life of the contract.

3.0 SCOPE OF WORK SUMMARY

The scope of work is divided into two primary categories:

3.1. Baseline FFP-LOE Scope (Core Workload):

The contractor shall provide an optimally sized, on-site support team to execute the daily, continuous functions of the CEN portfolio, including:

  • Core Program Execution: Full lifecycle project management for the Decentralized FSRM (dFSRM) and Oklahoma City Air Logistics Center (OC-ALC) Maintenance & Repair (M&R) programs. This requires a proactive execution strategy, including:
    • Planning and programming support (developing Project Assessed Amounts).
    • Developing "on-the-shelf" requirements and design packages in the fiscal year prior to execution (FY-1).
    • Developing dual-track Independent Government Estimates (IGEs) for programming and procurement.
    • Providing active solicitation support to the Contracting Office.
    • Providing comprehensive on-site construction management, utilizing the Three-Phase Quality Control process for all definable features of work.
  • Execution Support: Providing foundational engineering services, including:
    • Managing the Installation Geospatial Information & Services (IGI&S) / GeoBase program and Master Record Drawings.
    • Performing engineering evaluations, root-cause analyses, and ad-hoc technical support.
    • Managing the installation Excavation Permit program and Airfield Maintenance contracts.
    • Portfolio-wide warranty management and real property closeout (DD Form 1354).
  • Operations Engineering (Requirements & Optimization): Providing dedicated asset management, BUILDER sustainment system execution, and 5-year lifecycle planning for designated reimbursable customers (e.g., CSAG, Navy, DLA).

3.2. Orderable IDIQ Scope (Surge & Specialized Workload):

The contractor shall maintain the capacity (including corporate reach-back) to dynamically scale support for discrete, project-specific task orders, including:

  • Full Lifecycle Project Management for large, complex, or high-risk projects
  • Stand-Alone Requirements Package development and A&E Design Management.
  • Special Acquisition Support (developing new, large-scale contract vehicles).
  • Stand-Alone Construction Inspection Augmentation.
  • Stand-Alone External Agency Liaison (providing dedicated technical review and oversight for projects executed by external agents such as USACE or AFCEC).

4.0 KEY PERSONNEL & QUALITY REQUIREMENTS

The Government requires a highly credentialed workforce to mitigate risk and ensure technical rigor. Key Personnel requirements include, but are not limited to:

  • Chief Engineer & Lead Engineers: Must possess active Professional Engineer (PE) or Registered Architect (RA) licenses.
  • Senior Project Managers: Must possess Project Management Professional (PMP) certifications or equivalent degrees, with 7+ years of experience.
  • Lead Construction Inspectors: Must possess USACE Construction Quality Management (CQM) certification and applicable discipline-specific International Code Council (ICC) Commercial Inspector Certifications.

Furthermore, strict adherence to data integrity is paramount. The contractor will be required to manage project data accurately and timely within designated Government IT systems of record (e.g., NexGen IT, Kahua) and will be evaluated against stringent Quality Performance Indicators (QPIs) tied to schedule adherence, cost estimating accuracy, construction cost control, and data accuracy.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 12, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice 4d058079e8174e508fa6787c48224175

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought
  2. June 17, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice bd0d1bbe4640441198a46994eb5a0806

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought
  3. June 18, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice 5f53ee4934834e998a3ff5e45190af8c

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought
  4. July 2, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice 2a95942d49e845469878cd4a4a62d200

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought
  5. August 4, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice 68497b7b721d4951958ac31c9a050943

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought
  6. August 4, 2026

    Sources sought

    Due June 30, 2026 at 3:00 PM EDT. SAM.gov, notice 9b8e922b39234e10ada4df4b72d4afcf

    6 revisions on SAM
    • August 4, 2026: publish, sources sought
    • August 4, 2026: publish, sources sought
    • July 2, 2026: publish, sources sought
    • June 18, 2026: publish, sources sought
    • June 17, 2026: publish, sources sought
    • June 12, 2026: publish, sources sought

Points of contact