Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation

High Voltage (HV) Transformer

SLAC_RFP_346009(SL)

Department of Energy, SLAC Natl Accel Lab -DOE Contractor. Power, Distribution, and Specialty Transformer Manufacturing.

Response deadline

July 26, 2024 at 7:00 PM EDT

Closed 828 days ago. Posted July 22, 2024, first published June 14, 2024. Scheduled to archive July 27, 2024.

Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities

This one closed in 2024

52 like it are open now in power, distribution, and specialty transformer manufacturing

All 52 open in power, distribution, and specialty transformer manufacturing

Description

As published on SAM.gov.

SLAC seeks vendors that can submit a Fixed Price with Economic Price Adjustment Proposal for Critical Utilities Infrastructure Revitalization (CUIR) Master Substation (MSS) High Voltage (HV) Transformer in accordance with the RFP and the proposal preparation requirements and other applicable documents attached herewith. SLAC intends to replace the two existing High Voltage (HV) Transformers (T-1 and T-2) currently installed outdoor at the Master Substation (MSS).

The CUIR team conducted a Pre-Solicitation round in November 2023 and has modified the content of this RFP to include valuable industry input on lead time and trends. For a detailed understanding of our specific requirements for the two transformers, please refer to the RFP documentation including the specification document CUIR-PTS-0064-R2.

Your proposal must be received no later than Friday July 26, 2024, 4 PM PST and be valid for 90 days after submission SLAC_RFP_346009(SL)_Amd01 is released to address clarification questions received. The RFP due date remains the same. Acknowledgement of Amd01 by signing the Amd01 cover page is required for submission with proposal. SLAC_RFP_346009(SL)_Amd02 is released to address clarification questions received. The RFP due date remains the same.

Acknowledgement of Amd02 by signing the Amd02 cover page is required for submission with proposal. SLAC_RFP_346009(SL)_Amd03 is released to address clarification questions received. The RFP due date remains the same. Acknowledgement of Amd03 by signing the Amd02 cover page is required for submission with proposal.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 14, 2024

    Combined synopsis and solicitation

    Due July 26, 2024 at 7:00 PM EDT. SAM.gov, notice ae82b589af254aaebc228a3dbf86d66d

  2. July 10, 2024

    Combined synopsis and solicitation

    Due July 26, 2024 at 7:00 PM EDT. SAM.gov, notice a5d72f30b3604b49ab672383b661dc8d

  3. July 17, 2024

    Combined synopsis and solicitation

    Due July 26, 2024 at 7:00 PM EDT. SAM.gov, notice 6871daed1de3491aa0afaa054b116f30

  4. July 22, 2024

    Combined synopsis and solicitation

    Due July 26, 2024 at 7:00 PM EDT. SAM.gov, notice 08e096f626344500a47fb99c922227f4

Points of contact