Solicitation, total small business set-aside
Design-Build Services – STM Security Fencing - North Boundary
RFP-2027-27107
Department of Energy, Alliance for Energy Innovation, LLC - DOE Contractor. All Other Specialty Trade Contractors.
Offers due
November 11, 2026 at 7:00 PM EST
12 days from now. Posted October 30, 2026, first published October 7, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- 2026 Distributed Wind Turbine Competitiveness Improvement ProjectSolicitationNAICS 54171ColoradoRFX-2026-10008Closes in 13 daysNov 13
- Building America Subject Matter Expert Technical SupportSolicitationNAICS 541715Golden, CORFP-2026-10245()Closes in 17 daysNov 17
Similar, open now
- Lowline Area Burned Fence Construction Project
Forest Service, USDA Forest Service-Spoc Im
Combined synopsis and solicitationSmall businessNAICS 238990Anywhere in the US1240LT27Q0029Closes in 398 daysDec 3, 2027 - Crane Services
Department of the Navy, NAVSUP FLC Jacksonville Erp
Sources soughtNAICS 238990Panama City Beach, FLN6883627Q0008Closes in 4 daysNov 4 - FTC Oklahoma City- Replace Jet Bridge
Federal Prison System / Bureau of Prisons, Fao
Sources soughtNAICS 238990Oklahoma City, OK15B51326PR000174Closes in 4 daysNov 4
Description
As published on SAM.gov.
This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.
Project Overview
The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR’s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.
Design‑Build Requirements
The Subcontractor shall develop and submit design documents consistent with NLR’s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR’s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.
Construction Requirements
All construction activities must comply with NLR’s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.
Management, Coordination, and Quality Assurance
The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR’s Beneficial Occupancy process.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- NOI Submission Portal0 B, October 7, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
October 7, 2026
Solicitation
Due November 11, 2026 at 7:00 PM EST. SAM.gov, notice 2fa822e893384a93bccb65cb8ac7aea4
1 revisions on SAM
- October 7, 2026: publish, solicitation
October 8, 2026
Solicitation
Due November 11, 2026 at 7:00 PM EST. SAM.gov, notice 02fdc748f70d471abfba3cc6f8ac5a06
2 revisions on SAM
- October 8, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
October 22, 2026
Solicitation
Due November 11, 2026 at 7:00 PM EST. SAM.gov, notice 5988a90b5fb94514a89cebc7362a22b5
3 revisions on SAM
- October 22, 2026: publish, solicitation
- October 8, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
October 30, 2026
Solicitation
Due November 11, 2026 at 7:00 PM EST. SAM.gov, notice 603e4a9741dd4b4589cc770dcdf6f833
4 revisions on SAM
- October 30, 2026: publish, solicitation
- October 22, 2026: publish, solicitation
- October 8, 2026: publish, solicitation
- October 7, 2026: publish, solicitation
Points of contact
- Stephen Cummocksteve.cummock@nlr.gov9702170997
- Construction InboxConstruction@nlr.gov