# Design-Build Services – STM Security Fencing - North Boundary

Canonical: https://abierto.us/opportunities/rfp202727107

- Solicitation number: RFP-2027-27107
- Notice type: Solicitation
- Status: Open. Offers due November 11, 2026 at 7:00 PM EST
- Department: Department of Energy
- Contracting office: Alliance for Energy Innovation, LLC - DOE Contractor (899060)
- NAICS: 238990 All Other Specialty Trade Contractors
- Product or service code: 5660 Fencing, Fences, Gates and Components
- Set-aside: Total small business set-aside
- Place of performance: Golden, Colorado
- Who can bid, by location: Anywhere in the US. Location does not limit who can bid: a product shipped to the buyer, research at the performer's facility, or work at the contractor's site. A state shown is the delivery point.
- County: Jefferson County (FIPS 08059). https://abierto.us/counties/jefferson-county-co-08059
- City: Golden. https://abierto.us/cities/golden-co-0830835
- First posted: October 7, 2026
- Last posted: October 30, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/603e4a9741dd4b4589cc770dcdf6f833/view

## Description

This description is intended to summarize the project at a high level for procurement purposes. Interested parties must refer to the full SOW for complete technical requirements, detailed scope elements, design and construction deliverables, environmental obligations, safety standards, and administrative procedures. The SOW governs all expectations for this procurement.

Project Overview

The National Laboratory of the Rockies (NLR) is soliciting design‑build services for installation of new perimeter fencing along the North boundary of the South Table Mountain (STM) Campus. The work includes designing and installing new fencing, removing designated sections of existing chain‑link fence, and completing all related construction activities in accordance with NLR&rsquo;s design standards, construction specifications, and DOE site requirements. Portions of the work require coordination with the State Historic Preservation Office (SHPO). Interested parties must reference the full Statement of Work (SOW) for all detailed scope, technical requirements, and performance expectations.

Design‑Build Requirements

The Subcontractor shall develop and submit design documents consistent with NLR&rsquo;s required 50% and 90% design reviews, followed by preparation of a complete 100% Issued‑for‑Construction package. All design work must comply with applicable codes, NLR Design Standards, and required CAD/BIM formats. Throughout the effort, the Subcontractor must maintain alignment with NLR&rsquo;s design‑to‑cost objectives and utilize Procore for all project documentation, including drawings, specifications, RFIs, and submittals.

Construction Requirements

All construction activities must comply with NLR&rsquo;s safety, security, and environmental guidelines, including requirements for site access, personnel qualifications, and safe work practices. The Subcontractor is responsible for completing all utility locates before performing any excavation and must implement erosion control, material handling, and environmental protection measures as required. Waste prevention, recycling, and proper tracking of off‑site disposal activities must be performed in accordance with the SOW and associated exhibits.

Management, Coordination, and Quality Assurance

The Subcontractor shall provide qualified project management and on‑site supervision, maintain an approved Quality Assurance Plan, and participate in all required meetings, field observations, testing, and commissioning activities. The Subcontractor is responsible for coordinating deliveries, securing access authorization for personnel, and following all NLR and DOE security protocols. At project completion, the Subcontractor must deliver accurate as‑built documentation, testing records, and turnover materials in accordance with NLR standards and support NLR&rsquo;s Beneficial Occupancy process.

## Attachments

- [NOI Submission Portal](https://app.smartsheetgov.com/b/form/6a893305674d412d9e00dfb4b8bafab5)

## Open now in the same industry

14 open in NAICS 238990.

- Lowline Area Burned Fence Construction Project (1240LT27Q0029), due December 3, 2027 at 11:00 AM EST. https://abierto.us/opportunities/1240lt27q0029
- Crane Services (N6883627Q0008), due November 4, 2026 at 11:00 AM EST. https://abierto.us/opportunities/n6883627q0008
- FTC Oklahoma City- Replace Jet Bridge (15B51326PR000174), due November 4, 2026 at 5:00 PM EST. https://abierto.us/opportunities/15b51326pr000174

## Publications

- October 7, 2026: Solicitation, due November 11, 2026 at 7:00 PM EST. Notice 2fa822e893384a93bccb65cb8ac7aea4. https://sam.gov/workspace/contract/opp/2fa822e893384a93bccb65cb8ac7aea4/view
- October 8, 2026: Solicitation, due November 11, 2026 at 7:00 PM EST. Notice 02fdc748f70d471abfba3cc6f8ac5a06. https://sam.gov/workspace/contract/opp/02fdc748f70d471abfba3cc6f8ac5a06/view
- October 22, 2026: Solicitation, due November 11, 2026 at 7:00 PM EST. Notice 5988a90b5fb94514a89cebc7362a22b5. https://sam.gov/workspace/contract/opp/5988a90b5fb94514a89cebc7362a22b5/view
- October 30, 2026: Solicitation, due November 11, 2026 at 7:00 PM EST. Notice 603e4a9741dd4b4589cc770dcdf6f833. https://sam.gov/workspace/contract/opp/603e4a9741dd4b4589cc770dcdf6f833/view

## Points of contact

- Stephen Cummock, steve.cummock@nlr.gov, 9702170997
- Construction Inbox, Construction@nlr.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/rfp202727107.