Sources sought
Next Generation Gateway (NGG) Phase 2 RFI
NGG_Phase2_RFI
Department of the Air Force, FA8726 AFLCMC HNK C3IN. Telephone Apparatus Manufacturing.
Response deadline
May 3, 2024 at 1:00 PM EDT
Closed 867 days ago. Posted April 19, 2024, first published April 4, 2024. Scheduled to archive May 18, 2024.
Description
As published on SAM.gov.
NGG modernizes existing DAF infrastructure to provide Zero Trust Capabilities. The NGG implementation must be capable of sustaining a throughput of 40Gb/s (threshold)/ 100Gb/s (objective) at the CEDCs and 10Gb/s (threshold)/ 40Gb/s (objective) at the base boundary (Main Operating Bases). NGG Phase 1 is currently being deployed to 13 CEDCs.
NGG Phase 2 will extend the rollout of a Zero Trust solution to all 187+ Main Operating Bases (MOBs), which include the 13+ CEDCs from Phase 1 and the 174+ base boundaries (Main Operating Bases). NGG Phase 2 will determine architecture, design, functionality, products, and integration services to deploy a suitable solution to a flexible infrastructure on both NIPRNet and SIPRNet sites. These solutions must be able to support integration with approved Cloud Service Providers. This includes integration with SaaS and Cloud ONE (Azure, AWS, GCP, and OCI) for UNCLASS (IL2 – IL5), and SECRET (IL6) through DoD approved connections.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 4, 2024
Sources sought
Due April 18, 2024 at 1:00 PM EDT. SAM.gov, notice ef5be1007dd54455a161f003ca94d193
April 11, 2024
Sources sought
Due April 23, 2024 at 1:00 PM EDT. SAM.gov, notice 23349c3cee0044d386103edb494a39d2
April 19, 2024
Sources sought
Due May 3, 2024 at 1:00 PM EDT. SAM.gov, notice 2beb0cd843484a89891c08e719e4c998
Points of contact
- Daniel J. Dornfeld, Jr, Contracting Officerdaniel.dornfeld.2@us.af.mil
- Major Patrick Wu, Program Managerhunghao.wu.1@us.af.mil