Joint Base Pearl Harbor-Hickam Wave Attenuator Install

NAVMWR-25-R-0007

Department of the Navy, Commander Navy Installations CMD. Other Heavy and Civil Engineering Construction.

Response deadline

March 6, 2025 at 4:00 PM EST

Closed 561 days ago. Posted February 24, 2025, first published January 29, 2025. Scheduled to archive March 6, 2025.

Description

As published on SAM.gov.

This project includes all investigation, surveying, and construction necessary to design and install a wave attenuator as described herein. The project includes all demolition, relocation, temporary construction and restoration necessary to produce a complete and useable facility. The project includes installing a new floating wave attenuator system that is approximately 300 feet long and securing it to the ocean floor in the configuration noted herein. The work includes, but is not limited to the following:

1. Design of Wave Attenuator Site Development: There is not landside site development work required. The project has received approval from all authorities as referenced in Section J of the attached solicitation.

The work includes developing the detailed engineering, shop drawings and specifications for the floating wave attenuation systems, auger piles, mooring systems (chains, cables, etc) signage, and all related appurtenances and elements as well as specifying construction techniques in accordance with all requirements governing Rainbow Bay Marina JBPHH, Hawaii for certain components of the construction work such as anchoring operations for a complete and usable floating wave attenuation system.

2. Purchase and Installation of Wave Attenuator The new wave attenuator shall be a “whisper wave” product (or equal) and secured to the ocean bottom as required. Reference Attachment Section, Wave Attenuator Layout. The attenuation system shall be able to withstand the greater of; waves at least 4’ high or as called for in the wind wave analysis.

Anchorage to the sea bottom (encl 3c) shall be provided and installed in sufficient size, quantity and spacing to resist the environmental loads listed in the wind wave analysis. The connective ties that connect the floating wave attenuator to the anchors shall be as recommended by the manufacturer and able to withstand the forces listed in the wind wave analysis (encl 3d). They shall be of an appropriate material, that is elastic in nature (i.e. Sea Flex or equal) or rigid (i.e. chains or cables).

No utilities are to be installed in or extended to the wave attenuator system. Solar-powered LED lights to mark the location of the floating wave attenuator shall be installed as required by applicable law. Four mooring balls shall be installed an accordance with Marine spacing standards to allow mooring of vessels up to 50’ in length.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 29, 2025

    Solicitation

    Due February 28, 2025 at 4:00 PM EST. SAM.gov, notice f0e1134db63a4d049ef0b22c823bc06c

  2. February 7, 2025

    Solicitation

    Due February 28, 2025 at 4:00 PM EST. SAM.gov, notice 55cfa9366ce44376a9a48df4e4938a5b

  3. February 10, 2025

    Solicitation

    Due February 28, 2025 at 4:00 PM EST. SAM.gov, notice 9e71b31ac9c04452a3500fa643a4b7c9

  4. February 13, 2025

    Solicitation

    Due February 28, 2025 at 4:00 PM EST. SAM.gov, notice c0c39eca6d284c1f9bdd2bc2e6450477

  5. February 20, 2025

    Solicitation

    Due February 28, 2025 at 4:00 PM EST. SAM.gov, notice 2dc15e302a044e73b78bfe19396b6609

  6. February 24, 2025

    Solicitation

    Due March 6, 2025 at 4:00 PM EST. SAM.gov, notice 08941d85897946e9bf1117696ae8c264

  7. February 24, 2025

    Solicitation

    Due March 6, 2025 at 4:00 PM EST. SAM.gov, notice 7157aa00cef449db9c87e347e501100c