Skip to content
  • 6,807 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation, total small business set-aside

ONAN Generators A&E

FTQW25-1405

Department of the Air Force, FA5004 354 Cons PK. Engineering Services.

Response deadline

May 30, 2024 at 6:00 PM EDT

Closed 885 days ago. Posted May 13, 2024. Scheduled to archive September 30, 2024.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2024

93 like it are open now in engineering services

All 93 open in engineering services

Description

As published on SAM.gov.

Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this pre-solicitation until funds are available. The Government reserves the right to cancel this notice, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. This notice is a solicitation for Architect and Engineering services to be performed on Eielson AFB, Alaska.

The Combined Heat and Power Plant (CH&PP) provides primary generation of electricity and steam heat capabilities on Eielson Air Force Base (AFB). The primary building (B6203) of the plant was originally built in 1953, has been increased in size and capacity multiple times to keep up with Eielson AFB’s growth and expansion over the decades.

The existing 1.5-megawatt (MW) generators, four each, are used to pick up the electrical load when boilers or turbine-generators are being repaired and maintained or during extremely cold weather. At 25-years old, the generators have required major repairs to keep operational, and they are at the end of their life cycle.

Without them the CH&PP will, at times, not have enough capacity to handle Eielson’s peak electrical load, especially in the harsh winters, or be able to pick up the load during emergency outages of the turbine-generators and boilers. The project involves the phased replacement of four Onan generators with new equipment, including associated controls, to ensure continuous and reliable power generation capabilities. The design must facilitate a phased implementation approach to align with available funding and operational requirements.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 13, 2024

    Presolicitation

    Due May 30, 2024 at 6:00 PM EDT. SAM.gov, notice d266242b9eaa41cb9bd459c250a6eb43

Points of contact