# ONAN Generators A&E

Canonical: https://abierto.us/opportunities/ftqw251405

- Solicitation number: FTQW25-1405
- Notice type: Presolicitation
- Status: Closed. Deadline was May 30, 2024 at 6:00 PM EDT
- Department: Department of the Air Force
- Agency: Department of the Air Force
- Contracting office: FA5004 354 Cons PK (FA5004)
- NAICS: 541330 Engineering Services
- Product or service code: C219 Other Architect and Engineering Services
- Set-aside: Total small business set-aside
- Place of performance: Eielson AFB, Alaska
- County: Fairbanks North Star Borough (FIPS 02090). https://abierto.us/counties/fairbanks-north-star-borough-ak-02090
- City: Eielson AFB. https://abierto.us/cities/eielson-afb-ak-0221370
- First posted: May 13, 2024
- Last posted: May 13, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/d266242b9eaa41cb9bd459c250a6eb43/view

## Description

**Notice to Offeror(s)/Supplier(s):** Funds are not presently available for this effort. No award will be made under this pre-solicitation until funds are available. The Government reserves the right to cancel this notice, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. This notice is a solicitation for Architect and Engineering services to be performed on Eielson AFB, Alaska.

The Combined Heat and Power Plant (CH&PP) provides primary generation of electricity and steam heat capabilities on Eielson Air Force Base (AFB). The primary building (B6203) of the plant was originally built in 1953, has been increased in size and capacity multiple times to keep up with Eielson AFB’s growth and expansion over the decades.

The existing 1.5-megawatt (MW) generators, four each, are used to pick up the electrical load when boilers or turbine-generators are being repaired and maintained or during extremely cold weather. At 25-years old, the generators have required major repairs to keep operational, and they are at the end of their life cycle.

Without them the CH&PP will, at times, not have enough capacity to handle Eielson’s peak electrical load, especially in the harsh winters, or be able to pick up the load during emergency outages of the turbine-generators and boilers. The project involves the phased replacement of four Onan generators with new equipment, including associated controls, to ensure continuous and reliable power generation capabilities. The design must facilitate a phased implementation approach to align with available funding and operational requirements.

## Publications

- May 13, 2024: Presolicitation, due May 30, 2024 at 6:00 PM EDT. Notice d266242b9eaa41cb9bd459c250a6eb43. https://sam.gov/workspace/contract/opp/d266242b9eaa41cb9bd459c250a6eb43/view

## Points of contact

- Tara Richmond, tara.richmond@us.af.mil, 9073777482
- Nicholas Rogers, nicholas.rogers.13@us.af.mil, 907-377-2760

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/ftqw251405.