Skip to content
Abierto

Presolicitation

Repair & Maintain Airfield Stormwater System Phase II

FGWB21000AB_1

Department of the Air Force, FA6703 94TH Contracting Flight PK. Water and Sewer Line and Related Structures Construction.

Response deadline

July 7, 2026 at 2:00 PM EDT

Closed 73 days ago. Posted April 28, 2026. Scheduled to archive July 22, 2026.

Description

As published on SAM.gov.

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield.

In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 28, 2026

    Presolicitation

    Due July 7, 2026 at 2:00 PM EDT. SAM.gov, notice c38a5356637e45ea9c362dd71a3a8565

Points of contact