Sources sought
Request for Information (RFI) for Request for Information (RFI) For B-52 Advanced Wing Weapons Pylon (AWWP)
FA8628-27-R-B001
Department of the Air Force, FA8628 AFLCMC WBDK B52. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
July 6, 2026 at 5:00 PM EDT
Closed 118 days ago. Posted May 6, 2026. Scheduled to archive July 21, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
538 like it are open now in other aircraft parts and auxiliary equipment manufacturing
- Variable Frequency Generator (VFG) Life of Need Buy
Department of the Navy, Naval Air Systems Command
PresolicitationNAICS 336413Anywhere in the USN00019-27-RFPREQ-APM275-0224Closes in 2 daysNov 3 - EMALS/AAG Multi-Engineering Change Proposal (ECP) Kit Procurement (RFP Kittle)
Department of the Navy, Naval Air Systems Command
PresolicitationNAICS 336413Anywhere in the USN00019-26-RFPREQ-TPM251-0500Closes in 3 daysNov 4 - P-8A and E-7A Inlet Cowl Assembly Units
Department of the Navy, Naval Air Systems Command
Combined synopsis and solicitationNAICS 336413Anywhere in the USN00019-27-RFPREQ-APM290-0248Closes in 8 daysNov 9
All 538 open in other aircraft parts and auxiliary equipment manufacturing
Description
As published on SAM.gov.
The Department of the Air Force is issuing this Request for Information (RFI) to conduct market research and identify qualified industry partners capable of supporting an accelerated Engineering and Manufacturing Development (EMD) phase and subsequent production of a replacement external weapons release pylon for the B-52 aircraft.
To meet emerging mission needs, the Government requires a newly designed Advanced Wing Weapons Pylon (AWWP) that incorporates MIL-STD-1760 series heavy weapon capability.
The anticipated acquisition strategy targets a 36-month EMD phase culminating in a Critical Design Review (CDR). Upon successful completion of the EMD phase, the design must be ready for integration with required support equipment, transitioning immediately into the production of 20 to 24 pylons (with a minimum delivery of 12 pylons in the first year).
Key Objectives for Industry Feedback:
-
Assess the feasibility of the proposed 36-month EMD timeline to CDR and production timeline.
-
Identify vendors with the engineering expertise to design and manufacture heavy weapons carriage systems (>5,000 lbs capacity).
-
Inform the Government's overall Acquisition Strategy.
Note: Physical work locations may vary, and interested parties must be willing and able to travel. Small businesses are highly encouraged to participate and respond to this RFI.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFI_AWWP_6May26.pdf120 KB, May 6, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 6, 2026
Sources sought
Due July 6, 2026 at 5:00 PM EDT. SAM.gov, notice cc52f037101c4b628eb116bb439253ed
2 revisions on SAM
- May 15, 2026: publish, sources sought
- May 6, 2026: publish, sources sought
Points of contact
- Ashley Grayashley.gray.9@us.af.mil
- Matthew Leskomatthew.lesko@us.af.mil