Sources sought, first published as presolicitation
Contractor Kit Installation (CKI ) 2 of the Combined Block 7.0/8.1 Upgrade Modification to the United States Air Force(USAF) C-130J Fleet
FA862524RB001
Department of the Air Force, FA8625 AFLCMC WLNK C130. Aircraft Manufacturing.
Response deadline
February 2, 2026 at 8:30 PM EST
Closed 273 days ago. Posted January 9, 2026, first published July 26, 2024. Scheduled to archive February 2, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
38 like it are open now in aircraft manufacturing
- NGC
Department of the Air Force, FA8611 AFLCMC Wauk F22
Sources soughtNAICS 336411Wright-Patterson AFB, OHWA2026Closes todayNov 3 - BQM-34S Subsonic Aerial Target (SSAT) Full Rate Production (FRP) Lots 1-4
Department of the Navy, Naval Air Systems Command
PresolicitationNAICS 336411Anywhere in the USN00019-30-RFPREQ-WPM208-0002Closes todayNov 3 - AIRCRAFT, STRATOLIFTER, C/KC-135; IGNITER, SPARK, A/C HEATER
Defense Logistics Agency, DLA Aviation
Sources soughtNAICS 336411Anywhere in the USSPE4A727R0074Closes tomorrowNov 4
Description
As published on SAM.gov.
CONTRACTOR KIT INSTALLATION OF THE 7.0/8.1 BLOCK UPGRADE MODIFICATION TO THE UNITED STATES AIR FORCE (USAF) C-130J FLEET
GENERAL GUIDELINES: This Request For Information (RFI) is solely for the identification of potential small business sources for the above-stated modification program for market research and planning purposes and does not constitute a solicitation or request for proposals. Any response to this notice is not an offer and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for any and all expenses associated with responding to this RFI. The Government will not reimburse responders for any presentations, marketing efforts, or data related to their responses. The Government reserves the right to reject, in whole or in part, any responder's input resulting from this RFI. All information received in response to this RFI that is appropriately marked "proprietary" or "competition sensitive" will be handled accordingly. Only non-classified information shall be provided in any response. Copies of submitted information may be reproduced for Government review. Responses to this RFI will not be returned.
PURPOSE: The purpose of this RFI is to conduct market research to determine the existence and interest of prospective qualified small business sources that can accomplish Block 8.1 aircraft modification installations on approximately 115 C-130J and HC-130J aircraft. The aircraft includes mission-specific variations operated by the USAF (i.e. Air Mobility Command, Air Education and Training Command, Air Combat Command.) At present, each aircraft modification is expected to be complete in 130 days or less: including induction and inspections, installation, weights and balance, Quality Assurance (QA), Ground Tests, and Functional/Acceptance Check Flight. The first two (2) of each variant are allowed additional time (210 and 180 days respectively) to account for a learning curve. The USAF intends to provide approximately 15 - 21 aircraft per year.
RFI responses will be used to determine if this effort can be pursued as a partial or total Small Business Set-Aside acquisition. The Government is interested in responses from all responsible small businesses, including small business concerns, disadvantaged business concerns, Women-Owned Small Business (WOSB) concerns, Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, and Historically Underutilized Business zone (HUBZone) small business concerns.
REQUIREMENTS DESCRIPTION: The technical documents (Technical Orders/Time Compliance Technical Orders) are available by request through the Procurement Contracting Officer (PCO), Casey Murphy. Please email the PCO at AFLCMC.WLNN.Contracting.CKI2@us.af.mil and Sarah Woods at sarah.woods.3.ctr@us.af.mil. Include the name, email, phone number, and position/title of a specific Point of Contract to receive the Technical Orders/Time Compliance Technical Orders, via DOD SAFE (https://safe.apps.mil).
The Block 8.1 modification installs the following major capabilities and upgrades onto the C-130J weapon system:
1. Numerous software upgrades
2. New Communications Navigation, and Identification System Processor (CNI-SP)
3. Link-16
4. New Pilot and Co-pilot Control Wheel
5. New Civil Global Positioning System (GPS)
6. New mission computer
7. Upgraded Data Transfer and Diagnostic System (DTADS)
8. New Identification Friend or Foe (IFF) Transponder Mode 5
9. Enhanced internal-communication system (ICS); SATCOM Data Link; improved public address (PA) system
10. Covert lighting aft of the cargo ramp
Retrofit kits shall be provided as Government Furnished Property and shall include both Group "A" and Group "B" elements. Group "A" consists of fabricated installation parts such as wiring, plugs, racks, and common hardware. Group "B" includes Block 8.1 Line Replaceable Units (LRUs) and associated licenses. The C-130J Block 8.1 kit installations began in 2020 and there are approximately 100-115 aircraft left to be modified. The USAF anticipates the contract we are soliciting information for will commence in 2027. A commercial warranty is expected to be included for all work performed.
All required parts lists, installation instructions and retrofit schedules will be provided by the Government at the time of proposal solicitation.
RESPONSES: Responses to the RFI questionnaire shall be submitted to the Government electronically no later than close of business on 2 February 2026. If you need additional time, contact the PCO within three (3) days of receipt of this inquiry. Should you choose to submit information in addition to your responses to the questionnaire, please limit that information to no more than 10 additional pages. Responses should be emailed to the PCO, Casey Murphy, at AFLCMC.WLNN.Contracting.CKI2@us.af.mil and Sarah Woods at sarah.woods.3.ctr@us.af.mil.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 1 - CKI 2 PWS Dec 25.pdf1.7 MB, January 9, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 26, 2024
Presolicitation
DRAFT RFP for Contractor Kit Installation (CKI ) 2 of the Combined Block 7.0/8.1 Modification to the United States Government (USG) C-130J Fleet
Due August 9, 2024 at 5:00 PM EDT. SAM.gov, notice 2810e26d6a654277bf8089b3d9ab6300
January 9, 2026
Sources sought
Due February 2, 2026 at 8:30 PM EST. SAM.gov, notice 47028219b97748428769d556081a6547
1 revisions on SAM
- January 9, 2026: publish, sources sought
Points of contact
- Casey MurphyAFLCMC.WLNN.Contracting.CKI2@us.af.mil
- Thomas AligAFLCMC.WLNN.Contracting.CKI2@us.af.mil