Solicitation, women-owned small business set-aside, first published as presolicitation
19725785-Modernize Foyer, B3001G, Room 127
FA813726R0044
Department of the Air Force, FA8137 AFSC Pzioc. Commercial and Institutional Building Construction.
Response deadline
August 31, 2026 at 3:00 PM EDT
Closed 62 days ago. Posted August 21, 2026, first published July 15, 2026. Scheduled to archive September 1, 2027.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
184 like it are open now in commercial and institutional building construction
- WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationWOSBNAICS 236220OklahomaFA813727R0002Closes tomorrowNov 2 - WWYK240015 - Rehab Tanks 62501E & 62501W
Department of the Air Force, FA8137 AFSC Pzioc
SolicitationNAICS 236220OklahomaFA813726R0020Closes in 4 daysNov 5 - Minor Construction / Sustainability, Repair and Maintenance
Department of the Army, W6QK ACC-RI
Combined synopsis and solicitationNAICS 236220McAlester, OKW519TC-26-Q-JOC1Closes in 8 daysNov 9
All 184 open in commercial and institutional building construction
Description
As published on SAM.gov.
Update 04- August 21, 2026
1. RFP due date 31 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND CO sharla.flowers_brandon.1@us.af.mil.
2. Solicitation Amendment attached as: Solicitation Amendment FA813726R00440002 SF 30
Update 03- August 19, 2026
1. RFPs due 31 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND CO sharla.flowers_brandon.1@us.af.mil.
Update 02- August 18, 2026
1. RFIs are attached as: RFI Response 8-18
2. PWS attached as: PWS_Foyer Modernization
3. RFPs due 29 August 2026 2PM CST. Email CS dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil.
Update 01- August 10, 2026
1. Site visit was held and concluded. Sign In Sheet attached as Sign In Sheet 8-10
2. RFI's are due Friday August 14, 2026 at 2PM CST email dorothy.inoa@us.af.mil AND sharla.flowers_brandon.1@us.af.mil.
This posting is for Tinker AFB – WOSB construction contractors with NAICS 236220.
Project Solicitation Number: FA813726R0044
Project Title: 19725785-Modernize Foyer, B3001G, Room 127
Project Location: Tinker Air Force Base
19725785-Modernize Foyer, B3001G, Room 127- This project requires some demolition and modernization of the south building foyer. The existing entrance is outdated and does not reflect the professional and executive standard required for the facility. The purpose of this renovation is to modernize the space by introducing high-end finishes, improving energy efficiency with new lighting and controls. The project involves the selective removal of all designated existing finishes and fixtures, followed by a full architectural, mechanical, and electrical restoration. The final product will be a safe, durable, and fully operational entrance that provides an executive-level appearance and adheres strictly to all applicable Tinker AFB and Department of War (DoW) standards.
For project specific documents, please email dorothy.inoa@us.af.mil for access. Specific documents cannot be posted on SAM.gov. All documents are NOT CUI.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
After review of the attached project specific documents, if you are interested to attend the Initial Site Visit, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. The POC emails are dorothy.inoa@us.af.mil and sharla.flowers_brandon.1@us.af.mil. Your RSVP email must be received by 2:00pm CST on 3 Aug 2026. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access.
The site visit will be held on 5 Aug 2026.
After receipt of your RSVP and EAL if required, an Initial Site Visit will be coordinated.
You must attend the Initial Site Visit for the project to be considered eligible to propose.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- wage determination.txt17 KB, July 30, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 15, 2026
Presolicitation
Due July 29, 2026 at 5:00 PM EDT. SAM.gov, notice 0524d7a6320f439e8df11cbc5c1a2aad
2 revisions on SAM
- July 15, 2026: publish, presolicitation
- July 15, 2026: publish, presolicitation
July 15, 2026
Presolicitation
Due July 29, 2026 at 5:00 PM EDT. SAM.gov, notice 80d9920a21c34f32ade753e7f30f18fa
2 revisions on SAM
- July 15, 2026: publish, presolicitation
- July 15, 2026: publish, presolicitation
July 30, 2026
Solicitation
Due September 1, 2026 at 3:00 PM EDT. SAM.gov, notice a08ed9edc6694451950b78d6aba9928b
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
August 3, 2026
Solicitation
Due September 1, 2026 at 3:00 PM EDT. SAM.gov, notice 08bdafbacb254959b40c6bbab344e15c
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
August 10, 2026
Solicitation
Due September 1, 2026 at 3:00 PM EDT. SAM.gov, notice a3f64a75994f43d097fc07558620c492
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
August 18, 2026
Solicitation
Due August 29, 2026 at 3:00 PM EDT. SAM.gov, notice cd067ef2e6a8467daa14d7639bf33c45
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
August 18, 2026
Solicitation
Due August 29, 2026 at 3:00 PM EDT. SAM.gov, notice d1f87b927b4f4fe59ffd52d799a0de9c
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
August 21, 2026
Solicitation
Due August 31, 2026 at 3:00 PM EDT. SAM.gov, notice c018b69b6990400492f1e175683fda35
6 revisions on SAM
- August 21, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 18, 2026: publish, solicitation
- August 10, 2026: publish, solicitation
- August 3, 2026: publish, solicitation
- July 30, 2026: publish, solicitation
Points of contact
- Dorothy Inoadorothy.inoa@us.af.mil4058307450
- Sharla Flowerssharla.flowers_brandon.1@us.af.mil