Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Paint Booth Filters

FA485526Q0056

Department of the Air Force, FA4855 27 Socons LGC. Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing.

Response deadline

August 11, 2026 at 3:00 PM EDT

Closed 82 days ago. Posted August 5, 2026, first published July 30, 2026. Scheduled to archive August 26, 2026.

Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities

This one closed in 2026

36 like it are open now in industrial and commercial fan and blower and air purification equipment manufacturing

  • Sources Sought, Vaneaxial Fan Assembly, NSN: 4140-01-284-5722

    Department of the Army, W6QK Acc- Dta

    Sources soughtNAICS 333413Anywhere in the USW912CH-27-R-A025
    Closes tomorrowNov 2
  • FAN,VANEAXIAL

    Defense Logistics Agency, DLA Troop Support

    Combined synopsis and solicitationSmall businessNAICS 333413Anywhere in the USSPE8E727T0241
    Closes in 2 daysNov 2
  • IMPELLER,FAN,CENTRIFUG

    Defense Logistics Agency, DLA Aviation

    Combined synopsis and solicitationNAICS 333413Anywhere in the USSPE4A527T1824
    Closes in 2 daysNov 2

All 36 open in industrial and commercial fan and blower and air purification equipment manufacturing

Description

As published on SAM.gov.

AMENDMENT 0001 - Made to incorporate revised description along with Questions and answers in the "Revised Desc_QuestionsAnswers" document in the attachments provided.

AMENDMENT 0002 - Revisions made to CLIN 0003 / 0004, (amount of pockets and frame), UPDATED DELIVERY INFO:  Bldg 4607, 208 South Gunship rd, Cannon AFB, NM 88103, 45 ARO

This revision supercedes all previous versions of the description, Please ensure your final quotation reflects the revised quantities and updated specifications outlined.

Cannon AFB, NM requires a four-stage, EPA Method 319 (NESHAP) compliant paint booth exhaust filtration system for its Corrosion Control Facility to meet environmental air permit standards during painting operations. 

CLIN 0001 (Stage 1 Prefilter Blanket)
• Quantity: 15 Each (EA)
• Description: Polyester prefilter blanket. Dimensions: 102" x 90". Thickness: 1–2 inches. Must be Dual Denier (DD) or PPA media (DD309 or DD509 series).


CLIN 0002 (Stage 2 Exhaust Pads)
• Quantity: 45 Cases (CS) (packaged 20 per case; 900 filters total to fill 896 active slots)
• Description: Method 319 Compliant Exhaust Pads. Dimensions: 24" x 24". Must feature a tacky or multi-layered exhaust filter panel (MEPT) design.


CLIN 0003 (Stage 3 6-Pocket Bag,)
• Quantity: 150 Cases (CS) (packaged 6 per case; 900 filters total to fill 896 active slots)
• Description: Method 319 / NESHAP compliant 6-Pocket Bag Filters, no frame (No HDR). Dimensions: 24" x 24" with a 12-inch pocket depth.


CLIN 0004 (Stage 4 1 pocket Poly-Carbon Cube)
• Quantity: 150 Cases (CS) (packaged 6 per case; 900 filters total to fill 896 active slots)
• Description: 1-Pocket, No frame (No HDR), Poly-Carbon Cube Filters. Dimensions: 24" x 24" x 24" (24 inch depth) Used for gas-phase VOC and odor adsorption.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 30, 2026

    Combined synopsis and solicitation

    Due August 11, 2026 at 3:00 PM EDT. SAM.gov, notice 2526f615130c4821b138085b96777e2f

    3 revisions on SAM
    • August 5, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
  2. August 4, 2026

    Combined synopsis and solicitation

    Due August 11, 2026 at 3:00 PM EDT. SAM.gov, notice db9519b3c07f4bfca24fd135e229f41d

    3 revisions on SAM
    • August 5, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation
  3. August 5, 2026

    Combined synopsis and solicitation

    Due August 11, 2026 at 3:00 PM EDT. SAM.gov, notice c1ed62d3ec3744ed9bd67f9d2dfdb75e

    3 revisions on SAM
    • August 5, 2026: publish, combined synopsis and solicitation
    • August 4, 2026: publish, combined synopsis and solicitation
    • July 30, 2026: publish, combined synopsis and solicitation

Points of contact