Sources sought, total small business set-aside
Closed-Loop Wash Rack System
FA485525Q0024
Department of the Air Force, FA4855 27 Socons LGC. Commercial and Service Industry Machinery Manufacturing.
Response deadline
May 2, 2025 at 6:00 PM EDT
Closed 548 days ago. Posted April 21, 2025. Scheduled to archive May 17, 2025.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2025
50 like it are open now in commercial and service industry machinery manufacturing
- Project Name: Veteran Self-Employment Plan – AI Vending Machines; Project Number: None; and Station Location: Sioux Falls, South Dakota, Veterans Affairs Regional Office (VARO), Veteran Readiness and Employment (VR&E) Division
Department of Veterans Affairs, Veterans Benefits Admin
SolicitationSDVOSBNAICS 333310Anywhere in the US36C10D27Q0007Closes tomorrowNov 2 - RETAINER,BATTERY CA
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationNAICS 333310Anywhere in the USSPE7M127U0867Closes in 2 daysNov 2 - DISK,FRICTION
Defense Logistics Agency, DLA Weapons Support
Combined synopsis and solicitationSmall businessNAICS 333310Anywhere in the USSPE7LX27U0253Closes in 2 daysNov 2
All 50 open in commercial and service industry machinery manufacturing
Description
As published on SAM.gov.
20th Special Operations Aircraft Maintenance Squadron require this Closed Loop Wash Rack System to maintain Aerospace Ground Equipment (AGE) which directly supports a variety of aircraft including the AC-130J, MC-130J, CV-22, U-28, and MQ-9. This system will allow for efficient and environmentally friendly cleaning of equipment, ensuring that it is properly maintained and ready for use. By implementing this system, the squadron will be able to improve their maintenance processes and prolong the lifespan of their equipment, ultimately contributing to the overall readiness and effectiveness of their operations.
Closed-Loop Wash Rack System Specifications: - Minimum 400-gallon Stainless steel oil/water separator filtration system - NEMA 4 electrics - PLC controlled - Continuous HD ozone injection - High-pressure media filter - Auto backwash filter - Auto disk oil skimmer - Oil coalescing media - Continuous recirculation - Absolute filtration to 25-micron - Minimum 500 gallon holding tank with sensors - Up to 30 GPM of water delivery - Remote Operator Panel Other minimum specifications: (1) Hot water, Diesel 4GPM 3,000PSI pressure washer Spring Rewind Reel with standard pressure washer hose Standard Duty 25GPM @ 100PSI Water Cannon Approximately 20ft ISO Container for equipment housing that is co-located with Wash Rack Platform. Approximately 18 ft long X 12 ft wide wash rack standard platform w/5ft entry/exit Ramps for Drive on drive off has 6ft Side Walls.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 21, 2025
Sources sought
Due May 2, 2025 at 6:00 PM EDT. SAM.gov, notice 9a694207d44f437e92ae4f1cefe24274
Points of contact
- Ana Katrina Dela Cruzana_katrina.dela_cruz.1@us.af.mil575-784-4874
- Michael Boydmichael.boyd.9@us.af.mil