Skip to content
Abierto

Solicitation, hubzone set-aside

Demo Phase 18 Tyndall AFB

FA481926R0002

Department of the Air Force, FA4819 325 Cons PKP. Site Preparation Contractors.

Response deadline

February 6, 2026 at 3:00 PM EST

Closed 223 days ago. Posted January 29, 2026, first published December 18, 2025. Scheduled to archive March 31, 2026.

Description

As published on SAM.gov.

The Contractor shall be responsible for all professional services, permits, equipment, labor, tools, materials, and ancillary items necessary to complete the tasks defined by the Statement of Work (SOW). The performed tasks shall be based on the project description, other data furnished in SOW, and information covered during a pre-construction/criteria review meeting to be held prior to Contractor mobilization.

The SOW sets forth the requirements for a Request for Proposal (RFP) contract site specific demolition of 3 buildings/facilities located on Tyndall AFB, Florida.

The Contractor shall adhere to the following guidance during construction phase(s) of this project: Unified Facilities Criteria (UFC) 3-250-01, UFC 3-250-03, UFC 3-600-01, United States Army Corps of Engineers, Uniform Building Code (UBC), those sections of the Southern Standard Building Codes not incorporated in the UBC/International Building Code (IBC) for our respective area, Air Force Standards, Department of Defense (DOD) Directives, Florida State Statutes, Florida Department of Transportation (FDOT), the Tyndall AFB Facility Excellence Plan (Base Regulations), National Electric Code (NEC), Occupational Safety and Health Administration (OSHA) Requirements, Department of Environmental Protection (DEP) Regulations, Environmental Protection Agency (EPA) Regulations, and any related Americans with Disabilities Act (ADA) Compliance Requirements.

If there is a conflict between these codes, regulations and specifications, the most stringent requirements shall apply at all times. Documents listed by and/or provided by the Government are for reference only and do not relieve the Contractor from adherence with applicable codes not specifically addressed. The contractor shall also perform the required services in accordance with the SOW, applicable Construction Wage Rate, and all other contract terms and conditions.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. December 18, 2025

    Solicitation

    Due January 30, 2026 at 3:00 PM EST. SAM.gov, notice 87f85ee3c35244c99ae9350784bc92db

  2. January 12, 2026

    Solicitation

    Due January 30, 2026 at 3:00 PM EST. SAM.gov, notice 8664ab8aa7f44ae687d5ef29194a810e

  3. January 29, 2026

    Solicitation

    Due February 6, 2026 at 3:00 PM EST. SAM.gov, notice 44ad87d279814f9d98bfaa9b4278ab48

Points of contact