Sources sought, total small business set-aside
Buckley SFB Chiller Replacement
BuckleySFBChillerReplacement
Department of the Air Force, FA2543 460 Cons. Plumbing, Heating, and Air-Conditioning Contractors.
Response deadline
July 22, 2026 at 3:00 PM EDT
Closed 102 days ago. Posted July 14, 2026. Scheduled to archive August 6, 2026.
Get the next one like this from Department of the Air Force by email, the day it is posted.Find my opportunities
This one closed in 2026
44 like it are open now in plumbing, heating, and air-conditioning contractors
- R-410A LEAK DETECTORS (Bldgs 750, 751 & 768)
Department of the Air Force, FA4460 19 Cons Pka
SolicitationSmall businessNAICS 238220Anywhere in the USFA446027Q0006Closes tomorrowNov 2 - Green Mountain National Forest Storage tank cleaning and inspection at Hapgood Pond
Forest Service, Green Mountain National Forest
Closes tomorrowNov 2 - Cooling Tower Refurbishment - Three (3) Cells
Indian Health Service, Phoenix Area Indian Health SVC
Sources soughtIndian small businessNAICS 238220Winterhaven, CAACQ-IHS-2027-U-00021Closes tomorrowNov 2
All 44 open in plumbing, heating, and air-conditioning contractors
Description
As published on SAM.gov.
PLEASE SEE ATTACHMENTS FOR ADDITIONAL INFORMATION REGARDING THIS REQUIREMENT
Notice Type: Sources Sought (MARKET RESEARCH PURPOSES ONLY)
Title: Secure Facility Chilled Water System Replacement – Federal Installation, CO
NAICS Code: 238220 – Plumbing, Heating, and Air-Conditioning Contractors
Product Service Code (PSC): N041 – Installation of Equipment: Refrigeration, Air Conditioning, and Air Circulating Equipment
Response Date: 22 July 2026
Description:
The Department of the Air Force (DAF), on behalf of the Base Civil Engineer Squadron (CES) at a Federal Installation in Colorado, is conducting market research to identify qualified, experienced, and interested business sources—specifically targeting small and socio-economic businesses (e.g., 8(a), SDVOSB, HUBZone, WOSB)—capable of performing a complete chilled water system replacement in a 24/7 operations facility.
Project Objective: The chilled water system serving the facility's server room currently suffers from degraded serviceability, sub-component failures, and frequent downtime. It is operating at half capacity, which risks the loss of critical cooling for 24/7 operations. The selected contractor must provide all tools, equipment, materials, and certified labor to perform a complete system replacement with zero downtime to the active server room.
Key Scope Items & Technical Specifications:
-
Design & Sizing: Perform professional engineering cooling system design load calculations in accordance with UFC 3-410-01 (Sections 2-4 and 2-5.6) to determine final system capacity.
-
Standardization Requirement: In accordance with the DAF Class Justification and Approval (J&A) for HVAC Chiller Replacement Standardization, the design of the new chiller system must be standardized on Trane-series equipment for this installation.
-
Demolition: Safely decommission, recover refrigerant from, and remove the existing degraded chiller (Technical Systems Model: 30A0LM20-PT, Serial: 02-17-125822-001-001) and two existing Computer Room Air Handlers (CRAHs) (Data Aire Model: GFCU-04634, Serials: 2016-3226-A, 20163225-A).
-
Equipment Installation: Procure, install, and commission:
-
One (1) new water chiller with an integrated air-cooled condenser (Trane-series).
-
Two (2) new chilled-water Computer Room Air Handlers (CRAHs) inside the secure server room.
-
-
Temporary Cooling: Provide continuous, redundant temporary cooling to keep the secure server room strictly within operational temperature limits during the transition phase.
-
Controls Integration: Fully integrate new controls into the base-wide Energy Management Control System (EMCS) in strict compliance with Base EMCS Standards (dated January 21, 2026) and UFC 3-410-02.
Logistical & Physical Constraints:
-
Chiller Pad Limits: The new chiller must fit the existing concrete pad (19’ - 11” L x 12’- 8” W x 6” to 8” H) and must not exceed the structural wet weight limit of 12,000 lbs. If the equipment footprint exceeds these limits, the pad must be extended.
-
Rigging & Delivery Clearances: CRAHs must be navigated through a restricted interior corridor with doorway clearances measuring exactly 34” W x 82” H.
-
Electrical: Must integrate with the existing 460V, 60 Hz, 3-Phase power supply and comply with UFC 3-501-01.
-
Security & Clearances: All personnel must pass NCIC background checks, comply with strict OPSEC guidelines, and complete AT Level I training prior to facility access.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 1 - SOW - Chiller Replacement - CAO 20 May.pdf587 KB, July 14, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 14, 2026
Sources sought
Due July 22, 2026 at 3:00 PM EDT. SAM.gov, notice 0da19958a3d44b0799f019dd2bba01f3
1 revisions on SAM
- July 14, 2026: publish, sources sought
Points of contact
- Ethan Sullivanethan.sullivan@spaceforce.mil7208476446