Solicitation, first published as presolicitation
UT NP ARCH 100(2) Bridges on Delicate Arch Road
6982AF27B000005
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Offers due
November 19, 2026 at 4:00 PM EST
18 days from now. Posted October 22, 2026, first published September 8, 2026.
Get an email when this is amended, when the deadline moves and when it is awarded.Watch it
Next from this buyer
- TX FW LGA 10(5) Steve Thompson Wildlife DriveSolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 2 daysNov 3
- ND NP THRO 204(1) Buck Hill RoadSolicitationNAICS 237310Medora, ND6982AF25B000004Closes in 2 daysNov 3
- WY BR WYAO US20(1) US 20 and Hayden Arch Bridge RepairsSources soughtNAICS 237310Cody, WY6982AF27SS00001Closes in 3 daysNov 4
Similar, open now
- BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3 - Dugway Proving Ground (DPG) Horizontal Facility Construction Road Maintenance
Department of the Army, W6QM Micc-Dugway Prov GRD
Closes in 17 daysNov 18 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2
Description
As published on SAM.gov.
PROJECT NUMBER: UT NP ARCH 100(2)
PROJECT NAME: Bridges on Delicate Arch Road
PROJECT DESCRIPTION:
Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation.
DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.
SCOPE OF THE WORK:
This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay.
PRINCIPAL WORK ITEMS:
- 20420-0000 Embankment Construction: 10,000 CUYD
- 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
- 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
- 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON
- 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
- 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
- 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
- 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
- 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
- 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
- 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
- 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR
ANTICIPATED SCHEDULE:
Advertisement – September 2026
Award – November 2026
NTP – December 2026
Contract Completion – December 2028
ESTIMATED COST RANGE:
Total estimated cost between $10,000,000 and $20,000,000
This will be solicited as a full and open competition.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Site Visit Notice.pdf91 KB, September 29, 2026
- UT NP ARCH 100(2) Bridges on Delicate Arch Road-Delineators-JOFOC.pdf110 KB, October 6, 2026
- UT NP ARCH 100(2) Physical Data.zip34.6 MB, October 6, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 8, 2026
Presolicitation
Due September 23, 2026 at 4:00 PM EDT. SAM.gov, notice 9c354b9dd5844ea2aaf634299dcddf9e
1 revisions on SAM
- September 8, 2026: publish, presolicitation
September 29, 2026
Presolicitation
Due September 23, 2026 at 4:00 PM EDT. SAM.gov, notice e7f22f34b4084bc4a51cbe7efcdf7158
2 revisions on SAM
- September 29, 2026: publish, presolicitation
- September 8, 2026: publish, presolicitation
October 6, 2026
Solicitation
Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice af685a99d2ee4c27bb5ee208f29a097a
3 revisions on SAM
- October 6, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 29, 2026: publish, presolicitation
October 6, 2026
Solicitation, originally presolicitation
Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice e8bc65bff25a4308ba8f551f74459ef7
3 revisions on SAM
- October 6, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
- September 29, 2026: publish, presolicitation
October 15, 2026
Solicitation
Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice 98f2b984a52d48129a35f56b3c6cc43d
4 revisions on SAM
- October 15, 2026: publish, solicitation
- September 29, 2026: publish, presolicitation
- October 6, 2026: publish, solicitation
- October 6, 2026: publish, solicitation
October 22, 2026
Solicitation
Due November 19, 2026 at 4:00 PM EST. SAM.gov, notice 5e8ded2c1748433f991428d1a4ed3a71
5 revisions on SAM
- October 22, 2026: publish, solicitation
- October 15, 2026: publish, solicitation
- September 29, 2026: publish, presolicitation
- October 6, 2026: publish, solicitation
- October 6, 2026: publish, solicitation