Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, first published as presolicitation

UT NP ARCH 100(2) Bridges on Delicate Arch Road

6982AF27B000005

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Offers due

November 19, 2026 at 4:00 PM EST

18 days from now. Posted October 22, 2026, first published September 8, 2026.

Get an email when this is amended, when the deadline moves and when it is awarded.Watch it

Next from this buyer

Similar, open now

All 35 open in highway, street, and bridge construction

Description

As published on SAM.gov.

PROJECT NUMBER: UT NP ARCH 100(2)

PROJECT NAME: Bridges on Delicate Arch Road

PROJECT DESCRIPTION: 

Delicate Arch Road (DAR) is within Arches National Park (Park) and provides access to Delicate Arch. DAR is a functional class 1 roadway (Principal Park Road) and is heavily traveled by visitors and often congested during periods with moderate-to-high levels of visitation.

DAR crosses three low-gradient ephemeral washes (Salt Valley Wash, Salt Wash, and Winter Camp Wash) near their confluence in the Salt Wash Basin downstream of Wolfe Ranch. Culverts installed during original road construction in the mid-1990s and during subsequent upgrades are inadequate to allow unobstructed stream flow and sediment transport downstream. This existing condition produces flooding and sediment deposition, which creates unsafe conditions for visitors, triggers road closures, potentially strands Park visitors, diminishes visitor experience of the Park, and generates high operational costs associated with traffic management, visitor safety, and cleanup operations.

SCOPE OF THE WORK: 

This project will be designated as Reconstruction (4R) with one segment of restoration (3R), and will design and construct 100’ span concrete bridges at the Salt Valley Wash, Salt Wash, and Winter Camp Wash. The DA roadway profile at each Wash will be raised to accommodate a 10-year design frequency and allow a medium-sized excavator to access each wash. The DA will be realigned at the Salt Valley wash, moving the roadway and new bridge location to the north of the existing roadway and drainage crossing. The remaining 3R sections of the roadway will receive full depth reclamation (FDR) or removal of pavement, including all parking areas, followed by a 4-inch pavement overlay. 

PRINCIPAL WORK ITEMS:

  • 20420-0000 Embankment Construction: 10,000 CUYD
  • 25101-0300 Placed Riprap, Class 3: 1,725 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 5,140 TON
  • 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, 1/2-Inch or 3/4-Inch Nominal Maximum Size Aggregate, 0.3 To <3 Million ESAL: 8,300 TON
  • 55201-0200 Structural Concrete, Class A (AE): 752 CUYD
  • 55401-2000 Reinforcing Steel, Epoxy Coated: 138,000 LB
  • 55601-1100 Bridge Railing, Steel, Two Rail: 642 LNFT
  • 56501-0200 Drilled Shaft, 24-Inch Diameter: 750 LNFT
  • 56501-0300 Drilled Shaft, 30-Inch Diameter: 890 LNFT
  • 60901-1300 Curb, Concrete, 15-Inch Depth (Reinforced, Colored): 3,921 LNFT
  • 61701-4500 Guardrail System Mgs, Type 2, Class A Steel Posts: 1,290 LNFT
  • 63506-0500 Temporary Traffic Control, Flagger: 5,800 HOUR

ANTICIPATED SCHEDULE: 

Advertisement – September 2026

Award – November 2026

NTP – December 2026

Contract Completion – December 2028

ESTIMATED COST RANGE: 

Total estimated cost between $10,000,000 and $20,000,000

This will be solicited as a full and open competition.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 8, 2026

    Presolicitation

    Due September 23, 2026 at 4:00 PM EDT. SAM.gov, notice 9c354b9dd5844ea2aaf634299dcddf9e

    1 revisions on SAM
    • September 8, 2026: publish, presolicitation
  2. September 29, 2026

    Presolicitation

    Due September 23, 2026 at 4:00 PM EDT. SAM.gov, notice e7f22f34b4084bc4a51cbe7efcdf7158

    2 revisions on SAM
    • September 29, 2026: publish, presolicitation
    • September 8, 2026: publish, presolicitation
  3. October 6, 2026

    Solicitation

    Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice af685a99d2ee4c27bb5ee208f29a097a

    3 revisions on SAM
    • October 6, 2026: publish, solicitation
    • October 6, 2026: publish, solicitation
    • September 29, 2026: publish, presolicitation
  4. October 6, 2026

    Solicitation, originally presolicitation

    Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice e8bc65bff25a4308ba8f551f74459ef7

    3 revisions on SAM
    • October 6, 2026: publish, solicitation
    • October 6, 2026: publish, solicitation
    • September 29, 2026: publish, presolicitation
  5. October 15, 2026

    Solicitation

    Due November 10, 2026 at 4:00 PM EST. SAM.gov, notice 98f2b984a52d48129a35f56b3c6cc43d

    4 revisions on SAM
    • October 15, 2026: publish, solicitation
    • September 29, 2026: publish, presolicitation
    • October 6, 2026: publish, solicitation
    • October 6, 2026: publish, solicitation
  6. October 22, 2026

    Solicitation

    Due November 19, 2026 at 4:00 PM EST. SAM.gov, notice 5e8ded2c1748433f991428d1a4ed3a71

    5 revisions on SAM
    • October 22, 2026: publish, solicitation
    • October 15, 2026: publish, solicitation
    • September 29, 2026: publish, presolicitation
    • October 6, 2026: publish, solicitation
    • October 6, 2026: publish, solicitation

Points of contact