Sources sought, total small business set-aside
AZ BL COLO 7528(1) Burro Creek Road
6982AF26SS0012
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
June 4, 2026 at 4:00 PM EDT
Closed 150 days ago. Posted May 19, 2026. Scheduled to archive July 4, 2026.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2026
36 like it are open now in highway, street, and bridge construction
- AZ BL COLO 7528(1) Burro Creek Road
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Kingman, AZ6982AF27B000002Closes in 16 daysNov 17 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3
Description
As published on SAM.gov.
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs must submit the following by e-mail to cflacquisitions@dot.gov (Attn: Eric Grosskreuz) for receipt by close of business (2 p.m. local Denver time) on June 4, 2026:
(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;
(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;
(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $5 million, and your firm’s aggregate bonding capacity; and
(4) Provide a list of road construction projects of equal or greater value and similar scope to that described herein and in which you performed (as the prime contractor) work in a national forest, national park, Bureau of Land Management lands, national monument and/or natural resource sensitive areas. Experience in full depth reclamation or pulverization, asphalt paving and roadway culvert installation is required. State whether your firm was the prime contractor or subcontractor on the project.
DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.
The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov
Project Details:
AZ BL COLO 7528(1) Burro Creek Road
Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy 93. The project's length is approximately 1.3 miles.
The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items:
- Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.
- Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.
- Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns
- Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project.
The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.
PRINCIPAL WORK ITEMS:
Roadway Aggregate: 1,600 TONS
Ditch Reconditioning: 2,000 LNFT
Full Depth Reclamation: 1.3 MILE
Asphalt Concrete Pavement: 3,600 TON
18-Inch Pipe Culvert: 100 LNFT
24-Inch Pipe Culvert: 175 LNFT
Boulder: 100 EACH
It is anticipated that this project will be advertised in October 2026 and be under construction in January 2027. The project has an estimated completion date of October 2027.
The estimated price range of the project work is between $2,000,000 and $5,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 19, 2026
Sources sought
Due June 4, 2026 at 4:00 PM EDT. SAM.gov, notice 7aa228e328eb4096b6d7c2a949d26888
2 revisions on SAM
- September 15, 2026: publish, presolicitation
- May 19, 2026: publish, sources sought
Points of contact
- Eric Grosskreuzcflcontracts@dot.gov
- Kelly PalmerCFLcontracts@dot.gov