Presolicitation, total small business set-aside
TX FW LGA 10(5) Steve Thompson Wildlife Drive
6982AF26B000014
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
September 17, 2026 at 4:00 PM EDT
Closed 44 days ago. Posted September 1, 2026. Scheduled to archive October 2, 2026.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed 44 days ago
36 like it are open now in highway, street, and bridge construction
- TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 3 daysNov 3 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes in 2 daysNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 3 daysNov 3
Description
As published on SAM.gov.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE
PROJECT NUMBER: TX FW LGA 10(5)
PROJECT NAME: STEVE THOMPSON WILDLIFE DRIVE
PROJECT DESCRIPTION:
The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps.
The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded.
Alternate 1: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
Alternate 2: 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive.
Alternate 3: 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.
PRINCIPAL WORK ITEMS: The project includes the following work items:
Full Depth Reclamation (MILE) – 13 MILE
Aggregate Surface Course (TON) – 11,000 TON
ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027.
ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 1, 2026
Presolicitation, originally sources sought
Due September 17, 2026 at 4:00 PM EDT. SAM.gov, notice 59b8e11f822345fe8c0b03b9292dcab7
2 revisions on SAM
- August 4, 2026: publish, sources sought
- September 1, 2026: publish, presolicitation
Points of contact
- Douglas Whitcombcflacquisitions@dot.gov
- Jorey Demlcflacquisitions@dot.gov