# TX FW LGA 10(5) Steve Thompson Wildlife Drive

Canonical: https://abierto.us/opportunities/6982af26b000014

- Solicitation number: 6982AF26B000014
- Notice type: Presolicitation
- Status: Open. Offers due September 17, 2026 at 4:00 PM EDT
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Set-aside: Total small business set-aside
- Place of performance: Los Fresnos, Texas
- First posted: September 1, 2026
- Last posted: September 1, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/59b8e11f822345fe8c0b03b9292dcab7/view

## Description

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE PROJECT NUMBER: TX FW LGA 10(5)

**PROJECT NAME:**

**STEVE THOMPSON WILDLIFE DRIVE PROJECT DESCRIPTION:** The proposed project includes full depth reclamation of existing driving surface which includes chip seal material, and existing gravel. After completing full-depth reclamation new aggregate surface course will be added to create a driving surface that has a consistent width. The project also includes installation of aluminum gate and a small concrete pad and safety improvement signs and speed bumps. The project includes three alternate bid items for Aggregate Surface Course (TON) with one being awarded.

**Alternate 1:** 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.

**Alternate 2:** 2-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive.

**Alternate 3:** 3-inches of aggregate surface course added to Bayside Drive and Steve Thompson Wildlife Drive and terminating at Renee’s Overlook Parking Area.

**PRINCIPAL WORK ITEMS:** The project includes the following work items: Full Depth Reclamation (MILE) – 13 MILE Aggregate Surface Course (TON) – 11,000 TON ANTICIPATED SCHEDULE: The anticipated advertisement date is September 2026 with construction beginning in January 2027, and project completion in August 2027. ORDER OF MAGNITUDE: The proposed project cost ranges between $2,000,000 and $5,000,000.

## Publications

- September 1, 2026: Presolicitation, due September 17, 2026 at 4:00 PM EDT. Notice 59b8e11f822345fe8c0b03b9292dcab7. https://sam.gov/workspace/contract/opp/59b8e11f822345fe8c0b03b9292dcab7/view

## Points of contact

- Douglas Whitcomb, cflacquisitions@dot.gov
- Jorey Deml, cflacquisitions@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/6982af26b000014.