Skip to content
  • 8,096 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Presolicitation, total small business set-aside

OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail

6982AF25B000009

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Response deadline

September 26, 2025 at 4:00 PM EDT

Closed 408 days ago. Posted September 11, 2025. Scheduled to archive October 11, 2025.

Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities

This one closed in 2025

38 like it are open now in highway, street, and bridge construction

All 38 open in highway, street, and bridge construction

Description

As published on SAM.gov.

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE

PROJECT NUMBER: OK FW SQH T501(1)

PROJECT NAME: REHAB RIVERBANK & SANDTOWN WOODS TR

PROJECT DESCRIPTION:  The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of the U.S. Army Corps of Engineers (USACE) lands along Robert S. Kerr Reservoir created by the Robert S. Kerr Dam.

The project consists of improving visitor access and experience by repairing damaged areas of the bank, protect existing trail infrastructure, and to repair sections of trail damaged after the 2019 flooding event. This includes stabilization and repair of approximately 1,150 linear feet of riverbank and repair/reconstruction of approximately 500 linear feet of 6-foot-wide asphalt trail.

PRINCIPAL WORK ITEMS:

  • 2,700 CUYD of earthwork
  • 2,700 CUYD of place riprap
  • 60 TON of asphalt concrete pavement
  • 195 CUYD of topsoil.

The project work will be performed in a grassed upland area that contains some wooded vegetation offset from the riverbank.

ANTICIPATED SCHEDULE: 

Advertisement – September 2025

Award – November 2025

Contract Completion – January 2026

ESTIMATED COST RANGE:  Total estimated cost between $700,000 and $2,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 11, 2025

    Presolicitation, originally sources sought

    Due September 26, 2025 at 4:00 PM EDT. SAM.gov, notice fd620f1ff41541b6b380a77ef0d641eb

    3 revisions on SAM
    • September 11, 2025: publish, presolicitation
    • September 11, 2025: publish, presolicitation
    • July 30, 2025: publish, sources sought

Points of contact