OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail
6982AF25B000009
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
September 26, 2025 at 4:00 PM EDT
Closed 408 days ago. Posted September 11, 2025. Scheduled to archive October 11, 2025.
Get the next one like this from Federal Highway Administration by email, the day it is posted.Find my opportunities
This one closed in 2025
38 like it are open now in highway, street, and bridge construction
- OK FW TSM 10(1) NFH Entrance Road and Parking Improvements
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Tishomingo, OK6982AF27B000003Closes in 4 daysNov 12 - DDCN Building 154 Asphalt Milling and Paving
Department of the Army, W074 Endist Charleston
Sources soughtSmall businessNAICS 237310North CarolinaW912HP27QA010Closes in 2 daysNov 10 - Natchez Trace Parkway Project MS NP NATR 3F26
Federal Highway Administration, 693C73 Eastern Fed Lands Division
SolicitationNAICS 237310Mississippi693C73-27-B-000001Closes in 2 daysNov 10
Description
As published on SAM.gov.
THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE
PROJECT NUMBER: OK FW SQH T501(1)
PROJECT NAME: REHAB RIVERBANK & SANDTOWN WOODS TR
PROJECT DESCRIPTION: The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of the U.S. Army Corps of Engineers (USACE) lands along Robert S. Kerr Reservoir created by the Robert S. Kerr Dam.
The project consists of improving visitor access and experience by repairing damaged areas of the bank, protect existing trail infrastructure, and to repair sections of trail damaged after the 2019 flooding event. This includes stabilization and repair of approximately 1,150 linear feet of riverbank and repair/reconstruction of approximately 500 linear feet of 6-foot-wide asphalt trail.
PRINCIPAL WORK ITEMS:
- 2,700 CUYD of earthwork
- 2,700 CUYD of place riprap
- 60 TON of asphalt concrete pavement
- 195 CUYD of topsoil.
The project work will be performed in a grassed upland area that contains some wooded vegetation offset from the riverbank.
ANTICIPATED SCHEDULE:
Advertisement – September 2025
Award – November 2025
Contract Completion – January 2026
ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 11, 2025
Presolicitation, originally sources sought
Due September 26, 2025 at 4:00 PM EDT. SAM.gov, notice fd620f1ff41541b6b380a77ef0d641eb
3 revisions on SAM
- September 11, 2025: publish, presolicitation
- September 11, 2025: publish, presolicitation
- July 30, 2025: publish, sources sought
Points of contact
- Laura Slautercflacquisitions@dot.gov
- Jorey Demlcflcontracts@dot.gov