# OK FW SQH T501(1) Rehab Riverbank & Sandtown Wood Trail

Canonical: https://abierto.us/opportunities/6982af25b000009

- Solicitation number: 6982AF25B000009
- Notice type: Presolicitation
- Status: Closed. Deadline was September 26, 2025 at 4:00 PM EDT
- Department: Department of Transportation
- Agency: Federal Highway Administration
- Contracting office: 6982AF Central Federal Lands Divisi (6982AF)
- NAICS: 237310 Highway, Street, and Bridge Construction
- Product or service code: Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
- Set-aside: Total small business set-aside
- Place of performance: Vian, Oklahoma
- County: Sequoyah County (FIPS 40135). https://abierto.us/counties/sequoyah-county-ok-40135
- City: Vian. https://abierto.us/cities/vian-ok-4077250
- First posted: September 11, 2025
- Last posted: September 11, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/fd620f1ff41541b6b380a77ef0d641eb/view

## Description

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NUMBER: OK FW SQH T501(1)

**PROJECT NAME:**

**REHAB RIVERBANK & SANDTOWN WOODS TR PROJECT DESCRIPTION:** The Rehab Riverbank and Sandtown Woods Trail project is located in the Sequoyah National Wildlife Refuge in eastern Oklahoma approximately 90 miles southeast of Tulsa, Oklahoma. The Refuge sits at the confluence of the Arkansas and Canadian Rivers. The Refuge was established as an overlay of the U.S. Army Corps of Engineers (USACE) lands along Robert S. Kerr Reservoir created by the Robert S. Kerr Dam.

The project consists of improving visitor access and experience by repairing damaged areas of the bank, protect existing trail infrastructure, and to repair sections of trail damaged after the 2019 flooding event. This includes stabilization and repair of approximately 1,150 linear feet of riverbank and repair/reconstruction of approximately 500 linear feet of 6-foot-wide asphalt trail.

**PRINCIPAL WORK ITEMS:** 2,700 CUYD of earthwork 2,700 CUYD of place riprap 60 TON of asphalt concrete pavement 195 CUYD of topsoil. The project work will be performed in a grassed upland area that contains some wooded vegetation offset from the riverbank.

**ANTICIPATED SCHEDULE:** Advertisement – September 2025 Award – November 2025 Contract Completion – January 2026 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.

## Publications

- September 11, 2025: Presolicitation, due September 26, 2025 at 4:00 PM EDT. Notice fd620f1ff41541b6b380a77ef0d641eb. https://sam.gov/workspace/contract/opp/fd620f1ff41541b6b380a77ef0d641eb/view

## Points of contact

- Laura Slauter, cflacquisitions@dot.gov
- Jorey Deml, cflcontracts@dot.gov

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/6982af25b000009.
