Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

FAA Western & Central Facility Demolition, Removal and Restoration

6913G626R200004

Office of the Secretary, 6913G6 Volpe Natl. Trans. Sys CNTR. Site Preparation Contractors.

Awarded

Io Environmental and Infrastructure Incorporated

$109,928.74 obligated so far on USAspending

Get the next one like this from Office of the Secretary by email, the day it is posted.Find my opportunities

This one was awarded in 2026

9 like it are open now in site preparation contractors

All 9 open in site preparation contractors

Description

As published on SAM.gov.

The FAA no longer uses the equipment/buildings at the above-listed facilities. If the property is leased and there are no co-located facilities, the FAA will typically cancel the leases after the demolition and restoration activities take place. If the property is government-owned, the FAA will either sell the property or repurpose it for further government use. Prior to relinquishing these properties the FAA plans to remove environmental hazards, demolish or remove certain onsite structures and infrastructure, and restore disturbed areas. The DEN TANK is co-located at an active FAA facility complex and only the former tank and related infrastructure is being removed from the property.

TASKS TO BE PERFORMED

The Contractor shall conduct all work in accordance with Federal, State and local requirements.  Where inconsistencies exist, the Contractor shall follow the most stringent requirement.

​​​​​​​Demolition, Remediation/Removal, and Restoration Work Plan

The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below.

This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey reports for the facilities scheduled for demolition.

The contractor shall remove and/or demolish on-site structures and infrastructure in accordance with the procedures detailed in the site survey reports and the approved Final Work Plans. The contractor shall obtain all necessary local, state and federal permits for demolition work, complete any required paperwork, and pay any applicable fees unless otherwise discussed with the Government. These permits shall be submitted as an appendix to the work plan unless previously discussed with the Volpe Center.

Asbestos, lead-based paint (LBP) and PCB in building materials surveys were completed by licensed inspectors. The results are included as government furnished information (GFI). No asbestos-containing materials (ACM) were found at all three FAA facilities. Lead was not found in the soil above the FAA action level of 200 mg/kg at RVS and TJY OMs. LBP was not found on building materials, however, the orange-painted OM antennas at RVS and TJY were not sampled, and based on similar FAA projects, are presumed to contain LBP and shall be disposed as such. (SEE SOLICITATION for details)

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
KR51LA1KAMP7
CAGE
51H04
Vendor location
San Diego, CA
Contract
6913G626P800024, purchase order
Obligated
$109,928.74
Actions
1 between June 1, 2026 and June 1, 2026
Competition
Competed Under SAP, 6 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
Tjy Om, RVS Om (Tulsa, Ok) and Den Tank (Denver, Co) - Demolish, Dispose and Restore for FAA F26 Program
Match
solicitation number 6913G626R200004 equals the FPDS solicitation identifier; same awarding office 6913G6 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 10, 2026

    Combined synopsis and solicitation

    Due May 5, 2026 at 1:00 PM EDT. SAM.gov, notice 82d371b67ced40d9bc064fa054e3387b

    1 revisions on SAM
    • April 10, 2026: publish, combined synopsis and solicitation

Points of contact