Skip to content
Abierto

Combined synopsis and solicitation

Demolition, Removal, and Remediation

6913G626Q300044

Office of the Secretary, 6913G6 Volpe Natl. Trans. Sys CNTR. Site Preparation Contractors.

Awarded

Aces, LLC

$134,325.10 obligated so far on USAspending

Description

As published on SAM.gov.

The Contractor shall submit a draft Demolition, Removal, and Restoration work plan (Work Plan) within 10 business days after attending a kickoff meeting with the Volpe Center representatives that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all demolition, debris removal, disposal, and site restoration activities as required and described below.

To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished site survey report for the facility scheduled for demolition. The Work Plan shall describe methods and procedures for dismantling, demolishing, and/or removing structures and equipment designated for disposal, and restoration of the site listed in Section 1.1. Site-specific information is detailed in Section 5.0 Proposed Scope of Work subsections B, C and D in the individual site survey report.

The Work Plan shall also identify additional material sampling including sampling methods, analysis and quality control as may be required for waste characterization for all sites, if necessary. Disposal methods must be detailed for including the identification of all disposal facilities where waste and/or debris is to be shipped. In addition the work plan shall also identify any required permits needed to perform the work and the contractor shall be responsible for obtaining those permits as required.

Copies of the permits shall be attached to the work plan as an appendix. Additional components of the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a Risk Management Plan that identifies major risks and hazards on the site and discusses ways to minimize these risks.

The contractor should expect a 5 business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments. The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. See SOW for details.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

Recipient
Aces, LLC
UEI
TM48JSEN6KK5
CAGE
11UW3
Vendor location
Anchorage, AK
Contract
6913G626P800045, purchase order
Obligated
$134,325.10
Actions
1 between August 13, 2026 and August 13, 2026
Competition
Competed Under SAP, 7 offers received
Set-aside reported
Small Business Set Aside - Total
Described as
GFL Vor Demolition, Disposal and Restoration in Glens Falls, Ny for FAA F26
Match
solicitation number 6913G626Q300044 equals the FPDS solicitation identifier; same awarding office 6913G6 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 23, 2026

    Combined synopsis and solicitation

    Due August 4, 2026 at 1:00 PM EDT. SAM.gov, notice 98cbd07492794cedbe9a88f3f63bac7e

  2. August 4, 2026

    Combined synopsis and solicitation

    Due August 5, 2026 at 2:00 PM EDT. SAM.gov, notice e18e62ff57a54d45a892dc59ac04ca0b

  3. August 4, 2026

    Combined synopsis and solicitation

    Due August 5, 2026 at 2:00 PM EDT. SAM.gov, notice f336001a240144fb8537659d70accad4

Points of contact