Solicitation, total small business set-aside
Combined Concrete Repairs - Amendment 0001
47PD5526R0027
Public Buildings Service, PBS Project Delivery West - Branch E. Commercial and Institutional Building Construction.
Response deadline
May 7, 2026
Closed 183 days ago. Posted April 23, 2026, first published April 1, 2026. Scheduled to archive May 22, 2026.
Get the next one like this from Public Buildings Service by email, the day it is posted.Find my opportunities
This one closed in 2026
190 like it are open now in commercial and institutional building construction
- Navy Child Development Centers (CDC) Industrialized Construction (IC) Projects via Other Transaction Authority (10 U.S.C. § 2808a)
Department of the Navy, Navfacsyscom Atlantic
SolicitationNAICS 236220Location not publishedN6247027R0003Closes todayNov 6 - SABER FY 27-32
Department of the Air Force, FA8601 AFLCMC Pzio
Solicitation8(a)NAICS 236220OhioFA860126R0019Closes todayNov 6 - 163rd CE Flooring & Painting 2272
Department of the Army, W7MX Uspfo Activity Caang 163
PresolicitationSmall businessNAICS 236220CaliforniaPANNGB27P0000042127Closes todayNov 6
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
-responses to RFIs
-Incorporate revised SOW dated 04/20/26 and additional documents
-Offers due date extended to 05/07/2026. Must be received No Later than 4:30PM CST.
All other terms and conditions remain unchanged.
The General Services Administration (GSA) is seeking qualified contractors to perform concrete repair services at three federal facilities in Montana. Work includes structural concrete repairs to stairways, sidewalks, ADA-compliant ramps,and building exteriors.
1. James F. Battin Federal Courthouse - Billings, MT
Primary Work: Parking garage stairway repairs
Key Tasks: Comprehensive damage assessment
Repair cracks, spalling, and chipped stair treads
Rebar cleaning/replacement as needed
Surface leveling for smooth transitions
2. Bozeman USPS and Federal Building - Bozeman, MT
Primary Work: Perimeter sidewalk and ADA ramp repairs
Key Tasks: Full exterior walkway assessment
Concrete repair including truncated dome surfaces
Root damage mitigation
Surface leveling and transitions
3. Mike Mansfield Federal Building - Butte, MT
Primary Work: Selective concrete patching
Key Tasks: Remove deteriorated concrete to sound base
Rebar restoration or replacement with epoxy anchoring
Bonding agent application and patching
Match existing finishes
Common Requirements Across All Sites:
Obtain all necessary permits and licenses
Perform thorough pre-work assessments
Execute standard concrete repair procedures: saw cut-ting, excavation, subgrade prep, forming, reinforcement, finishing, and curing
Ensure smooth transitions and proper surface levels
Address any exposed or damaged reinforcing steel
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Solicitation Package (47PD5526R0027).zip1.2 MB, April 1, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 1, 2026
Solicitation, originally presolicitation
Combined Concrete Repairs
Due April 30, 2026. SAM.gov, notice 496898d97caf403ca7ff67b9674d80fa
3 revisions on SAM
- April 23, 2026: publish, solicitation
- March 18, 2026: publish, presolicitation
- April 1, 2026: publish, solicitation
April 23, 2026
Solicitation
Due May 7, 2026. SAM.gov, notice 65c153ccdb1149ef8df17bbc2f285e06
3 revisions on SAM
- April 23, 2026: publish, solicitation
- March 18, 2026: publish, presolicitation
- April 1, 2026: publish, solicitation
Points of contact
- John Morelionjohn.morelion@gsa.gov