Skip to content
  • 8,082 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

CON 648-25-100 Bldg.11 E-wing Medical Gas Outlet Replacement

36C26025R0084

Department of Veterans Affairs, 260-Network Contract Office 20. Commercial and Institutional Building Construction.

Response deadline

August 22, 2025 at 3:00 PM EDT

Closed 443 days ago. Posted August 11, 2025, first published August 11, 2025. Scheduled to archive September 1, 2025.

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one closed in 2025

189 like it are open now in commercial and institutional building construction

All 189 open in commercial and institutional building construction

Description

As published on SAM.gov.

Scope of Work/Synopsis Project 648-25-100 Bldg. 11 E-wing Medical Gas Outlet Replacement Vancouver WA The project will include: All work to occur after 8:00 am and finish by 5:00 pm Monday through Sunday. All medical center activities will remain open throughout the duration of the construction. Contractor to ensure that all medical center activities remain unimpeded by construction activities. Contractor to provide ASSE 6010 Certified Installer & 6030 Certified Verifier. Contractor to provide all labor, materials, certifications, equipment and devices to replace existing medical air (MA), medical vacuum (MV), and oxygen (O2) outlets with new. This project will occur in two phases. Patients and VA staff will occupy all other spaces in building 11, E-wing. VA will provide E-wing patients with devices and oxygen tanks throughout the duration of this project. This will allow the contractor to lock out/tag out the E-wing MA, MV and O2 that supplies services to each patient room. This is for safety. The contractor will have 2 weeks to complete phase 1. The VA will inspect the work and when approved will take 1 week to move patients into the phase 1 rooms with their devices and tanks. The contractor will then have 2 weeks to finish phase 2. VA expects the work to be completed within 5 weeks. Work will not start until all submittals are complete and all materials are on hand/site. Contractor shall purge the main/branch lines and certify according to the specifications. Refer to the specifications for all work required for successful completion. Contractor shall ensure that all Class 4 ICRA requirements are met according to the permit. Provide a negative air machine in each patient room per phase. Route the exhaust outside the window. Secure with plywood to prevent unauthorized access into the rooms. Ensure that smoke is exhausted outside of the facility. VA FMS uses Anteroom by hepacart to satisfy the Class 4 ICRA requirements. Contractor shall provide/rent/use something equivalent for this project. VA FMS will not provide these for this project. E-wing has wooden stud framing so contractor must take all precautions to prevent fire hazards. See specifications for additional requirements related to Fire and Life Safety.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 11, 2025

    Sources sought

    Due August 22, 2025 at 3:00 PM EDT. SAM.gov, notice 0814b31be281463d8e639074f1d48820

    3 revisions on SAM
    • October 27, 2025: publish, solicitation
    • August 11, 2025: publish, sources sought
    • August 11, 2025: publish, sources sought
  2. August 11, 2025

    Sources sought

    Due August 22, 2025 at 3:00 PM EDT. SAM.gov, notice 346dd97a8d4a4305bc4c7cddf3405b15

    2 revisions on SAM
    • August 11, 2025: publish, sources sought
    • August 11, 2025: publish, sources sought