Skip to content
  • 8,082 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Solicitation, service-disabled veteran-owned small business set-aside

Refeed Electrical from Generator Room to ATS# 3

36C25925Q0638

Department of Veterans Affairs, Network Contract Office 19. Electrical Contractors and Other Wiring Installation Contractors.

Awarded

Veterans Pre-Construction & Visual Solutions, LLC

$50,104.50 obligated so far on USAspending

Get the next one like this from Department of Veterans Affairs by email, the day it is posted.Find my opportunities

This one was awarded in 2025

43 like it are open now in electrical contractors and other wiring installation contractors

All 43 open in electrical contractors and other wiring installation contractors

Description

As published on SAM.gov.

RFQ 36C25925Q0638 Refeed Electrical from Generator Room to ATS #3 Vendor Questions and VA answers in red CONTRACTOR Q&As #1 Question No. 1: How many days' notice do we need to provide to access the two ER rooms and pipe out of both? Answer No. 1: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work Question No. 2: How long can each ER be shut down? And can both be shut down simultaneously, or will they need to be phased down? Answer No. 2: Please provide an overall schedule to include the days that you will need access to the rooms as a submittal prior to start of work Question No. 3: Is there a way to coordinate access to the 2 ER Rooms in the same day, shut down the ATS 3, which powers all or most of the hospitals MRI machines, and Panel EGR to tie it all in, in the same week and shut down ATS#3 and the panel feeding it, all in the same week? Answer No. 3: Part 1: both ER rooms would be able to be closed at the same time, in doing so a barrier would have to be placed at the entrances, as only one tile can be out at a time otherwise. Part 2: ATS-3 is critical and down time is limited to four hours in total, it can not be down for a week. Question No. 4: What are the hours we can work, without noise affecting patients with drilling through concrete walls? Answer No. 4: There is no best time to work.  Patient occupancy fluctuates. COR work hours are 7:00am to 1530pm. Question No. 5: What are the busiest days for MRIS? Answer No. 5: It varies, as it supports our emergency patients as well as regularly scheduled patients, two weeks notice and coordination will ensure goal is met for outage. Question No. 6: How long can we shut MRIS down? Answer No. 6: No more than 4 hours. Provide schedule of work Question No. 7: Do we need to shut down the Panel EGP, which supplies ATS #3 and features a 225 amp breaker, in order to work on it, or can we work on it while it's live? Answer No. 7: Panel EGP is only energized when the generator is running, there will be no problem in shutting the main breaker off, located left of the panel in generator control gear, as long as electrical staff is made aware at the time, no notice would be required for this portion of the project. Question No. 8. Please confirm award contractor will have access to the emergency room during construction. Answer No. 8: Yes, the contractor will have access to the emergency room, however, the COR will have to badge the contractors in Question No. 9: Since construction will be performed in an active emergency room, will an ICRA plan be provided to all bidders? Answer No. 9: Yes an ICRA will be provided to all bidders Question No. 10: Can the VA specify conduit and wire size/type that needs to be installed? Answer No. 10: 4) 4/0s 1) #4 ground, in a 2 1/2' or 3 conduit, contractor s choice. Question No 11: Can an alternate route be considered? Outside above the canopy walkway possibly? This would keep us from having to go through ER areas. Answer No. 11: Conduit needs to be ran with existing conduits, everything currently ran on the outside is for temporary equipment only, permanent utilities need to be physically secured and away from damage. Question No. 12: Does the new feeder need to be in place and ready to terminate before we can demo the old feeder? Or can we demo old feeder as we install new feeder? Answer No. 12: Yes, new feeder needs to be in place prior to demo of existing feeder, providing continuity of backup generator feed serving critical loads and patients. Question No. 13: Please confirm if we can do all of the install during normal working hours. Answer No. 13: Normal business hours would be best as this is an emergency room, which never shuts down.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
FAPZQ1BR9L58
CAGE
9E1Z3
Vendor location
Dallas, TX
Contract
36C25925P1096, purchase order
Obligated
$50,104.50
Actions
2 between September 9, 2025 and November 25, 2025
Competition
Competed Under SAP, 4 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
Refeed Electrical
Match
solicitation number 36C25925Q0638 equals the FPDS solicitation identifier; same awarding office 36C259 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 17, 2025

    Solicitation, originally presolicitation

    Due August 18, 2025 at 11:00 AM EDT. SAM.gov, notice 64d3bbac9f23466599143f8fc586d053

  2. July 17, 2025

    Presolicitation

    Due July 17, 2025 at 6:00 PM EDT. SAM.gov, notice a881fa06a4354ec3b5ec507419740010

  3. July 26, 2025

    Solicitation

    Due August 18, 2025 at 11:00 AM EDT. SAM.gov, notice 16a96918c8ae4eb395b5d5fd35527d95

    3 revisions on SAM
    • August 12, 2025: publish, solicitation
    • July 26, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation
  4. August 12, 2025

    Solicitation

    Due August 18, 2025 at 11:00 AM EDT. SAM.gov, notice 454433d5b5f54b49b33c44f5799b1a87

    3 revisions on SAM
    • August 12, 2025: publish, solicitation
    • July 26, 2025: publish, solicitation
    • July 17, 2025: publish, solicitation

Points of contact