Skip to content
Abierto

Award notice, service-disabled veteran-owned small business set-aside, first published as presolicitation

537-17-115: SPS Renovation Phases 2, 3 & 4

36C25225B0001

Department of Veterans Affairs, 252-Network Contract Office 12. Commercial and Institutional Building Construction.

Awarded

JV6 Contracting V2 LLC

$2,948,624.00 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of March 20, 2025.

Accompanying Amendment 36C25225B0001 0004 SPS Renovation Construction Phases 2, 3 & 4 project#537-17-115 Jesse Brown VA Medical Center, Chicago, IL I. The following changes are to be made to the solicitation:

1. THE BID OPENING IS HEREBY CHANGED FROM IN-PERSON TO VIRTUAL.

2. THE BID OPENING DATE IS HEREBY EXTENDED FROM MARCH 24, 2025 TO MARCH 26, 2025 (see additional information below in red) 3. ADD RYAN McMILLIN TO THE point of contact OF REQUEST FOR INFORMATION (RFI) AND BID RECIPIANTS AT RYAN.McMILLIN@va.gov a. VIRTUAL BID OPENING INFORMATION:

1) Reminder, there will be no in-person public bid opening process. This will be conducted as a public virtual activity.

2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number: Join the meeting now (Meeting will be available to be accessed 15 min prior to bid opening)

Meeting ID:

243 355 189 787 Passcode: B2gJ7Ae7 Dial-in by phone: 872-701-0185; Phone conference ID: 699 467 033# 3) IAW FAR 52.214-5 Submission of Bids and FAR 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at Stacy.Hoover2@va.gov AND Ryan.McMillin@va.gov as follows:

BIDS DUE: Vendor bids are due via email as shown above at 10:00 AM local time on 3/26/2025. The virtual public bid opening will be held at 11:00 AM local time on 3/26/2025 at the link and/or the phone # provided above. A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).

4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer. 5) Ensure your bid includes the completed VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) found on pages 67 and 68 in the original SF1442 solicitation document for reference.

6) It is highly recommended that Bidders submit their bid at least one hour prior to the bid due date/time to avoid any transmission issues. II. The following changes are made on project specifications: Add Specification 09 65 16 Resilient Sheet Flg III. The following changes are made on project drawings: n/a IV. The following Questions and Answers / Clarifications are the result of bidders request(s) for information: 13. How long is the duration of each phase of this project?

13A: It may vary. Not all activities of phases are inter-dependent, but some activities may be related and must follow up the previous activity before starting a new one. Contractor to keep in mind to meet the project finishing deadline, and diligently maintain the flow of work accordingly.

14. The mechanical drawings (MH-102-3 Demo KN 1) and the statement of work indicate that the new AHU is to be ready to connect before demolition of the existing AHU and that the SPS area is to continue to function throughout construction. There will be a significant amount of down time required for the AHU switchover. What is the intent for continuous operation during this time? Will temporary air handling units be required? If so, how many, and where will they be required?

14A: The function of this department is Sterile Processing of clinical tools and utensils. It is important to maintain strict temperature and humidity and anticipated down-time shall be minimal so that high cost of temporary trailer can be released upon completion of the project. Temporary air handling units or spot coolers for SPD may be required depending upon the area coverage needed. 15. Can you please confirm is the highlighted rooms below are the same.

15A: 16. In Phase 4 the flooring called out is WSF-1 I do not see this called out in the spec book. Can you please confirm the spec for WSF-1.

16A: A new specification Section 09 65 16 is added. V. general information: 1. Additional Instructions to bidders: VAAR 852.219-73 was included in this solicitation and references the SBA certification database at https://veterans.certify.sba.gov/. However, the website portal at the foregoing link is now static and is no longer being updated as of August 2024. To be eligible for award, a vendor must be listed as SDVOSB certified in the SBA certification database (under Government Certifications) found at the Dynamic Small Business Search website:  https://dsbs.sba.gov/search/dsp_dsbs.cfm.       Â

NOTHING FOLLOWS

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
G9D2UY3LDNJ3
CAGE
0NXQ7
Vendor location
Des Plaines, IL
Contract
36C25225C0049, definitive contract
Obligated
$2,948,624.00
Actions
5 between July 18, 2025 and September 12, 2026
Competition
Full and Open Competition After Exclusion of Sources, 2 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
537-17-115 Remodel SPS Construction Phases 2,3&4 at the Jesse Brown VA Medical Center, Chicago, Il
Match
award number 36C25225C0049 equals the contract number; same awarding office 36C252 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 9, 2024

    Presolicitation

    537-17-115 SPS Construction Phase 2

    Due September 9, 2024 at 5:00 PM EDT. SAM.gov, notice 57ec020829aa4bda80e735bcde72b7d6

  2. September 18, 2024

    Presolicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due November 22, 2024 at 11:00 AM EST. SAM.gov, notice 7520c407050a4cd2b46dcd7b93e566f0

  3. February 14, 2025

    Solicitation, originally presolicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due November 22, 2024 at 11:00 AM EST. SAM.gov, notice 1cff1502fe6f4d4fbcc94aee414b44d7

  4. February 18, 2025

    Solicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due March 17, 2025 at 11:00 AM EDT. SAM.gov, notice b908faa8377b4a01a58a10c41b734579

  5. February 27, 2025

    Solicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due March 17, 2025 at 11:00 AM EDT. SAM.gov, notice 2b59d705912f4011a0802a790e150d1a

  6. February 27, 2025

    Solicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due March 17, 2025 at 11:00 AM EDT. SAM.gov, notice dd266734aba54fb3b8501549f9118dc8

  7. March 14, 2025

    Solicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due March 24, 2025 at 11:00 AM EDT. SAM.gov, notice 8a2e550ac1c94b3f887d81d843d302cb

  8. March 20, 2025

    Solicitation

    537-17-115: SPS Construction Phase 2, 3 &4

    Due March 26, 2025 at 11:00 AM EDT. SAM.gov, notice a757bed899294b0abfe4eb6d0adec22f

  9. July 28, 2025

    Award notice

    Awarded to JV6 Contracting V2 LLC Des Plaines 60018 for $2,948,624. SAM.gov, notice 02247000d5964750ba4c645834fb3dc1

Points of contact