Award notice, service-disabled veteran-owned small business set-aside, first published as special notice
542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary
36C24423R0083
Department of Veterans Affairs, 244-Network Contract Office 4. Commercial and Institutional Building Construction.
Awarded
$17,450,621.65 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of December 28, 2024.
STATEMENT OF WORK RENOVATE BUILDING 58 1st and 2nd FLOORS PROJECT NO. 542-19-113 COATESVILLE VA MEDICAL CENTER DESCRIPTION: This project will renovate roughly 32,000 square feet of the first and second floors of Building 58, to provide a Domiciliary for Veterans. The two floors of renovated areas will include private rooms with adjacent private bathrooms with showers. Each floor will function as its own Domiciliary unit.. The work includes all associated architectural, civil, structural, and mechanical work.
PLACE OF PERFORMANCE: The Coatesville VA Medical Center (CVAMC) - 1400 Blackhorse Hill Rd, Bldg. 58, Coatesville, PA 19320. BACKGROUND: The purpose of this project is to renovate the 1ST and 2nd floors of building 58 for a new Domiciliary unit.
SCOPE: This project is to totally gut most of the 1st and 2nd floors of Building 58, and restructure them for a more efficient Domiciliary for the veterans. These areas will include private and semi-private rooms with adjacent bathrooms, and all associated support functions as outlined in the VA Design Guidance. This project will replace all mechanical and electrical/lighting system elements with new systems appropriate for the new spaces.
It will replace toilet and shower rooms and all plumbing associated with 1st and 2nd Floors. It will replace sprinkler lines to be in coordination with above ceiling services. It will provide new cable trays and cabling in coordination with IT Services. Note that the new mechanical systems must avoid, or minimize the use of fan coil units. It will provide the necessary ventilation and cooling for the machine room.
This project must provide complete and functional systems in accordance with the Department of Veterans Affairs (VA) requirements, industry standards and all applicable code requirements. This applies to each system and every system, as a whole, which is affected by this project, even if only partially modified. The systems and equipment must maximize energy efficiency to the extent practical.
PERFORMANCE REQUIREMENTS: The contractor must comply with all performance requirements listed herein, and all work must be performed in accordance with the attached Drawings, the Construction Specifications, and the Safety and Health During Construction. Contractor is required to follow all Coatesville VAMC and OSHA safety regulations. Contractor is required to provide a crane lift plan to the COR prior to the start of work. Contractor must secure payment/performance bond.
Contractor will ensure that all employees pass through the COVID 19 screening directly upon entering the CVAMC campus and follow and COVID-19 procedures that may in place at the time the work is performed. Contractor must provide a full breakdown of costs in the proposal to include labor codes for prime contractor employees and subcontractors. Contractor to coordinate with the COR any equipment shutdowns that would be required to prevent fumes from entering the building.
Contractor to coordinate with COR any parking or road shutdowns needed to perform the work. Parking or road shutdowns require three weeks notice to the facility. Contractor must only park one company marked vehicle at the project site. All other vehicles (company and employee POV s) must be parked in designated parking lots on the north side of Black Horse Hill Road. Contractor must not perform any additional work outside the scope of this contract without prior authorization from the contracting officer. Only the contracting officer has authority to modify this contract.
Construction Barrier: The contractor must provide a safety barrier around the construction site / work area, comprised of fencing, plastic barrier, caution tape and signage.
Materials: All materials or items to be supplied by the contractor that are not listed in an attachment must first be submitted to the Contracting Officer Representative (COR) and the Contracting Officer (CO) for approval prior to installation.
Testing and Acceptance: At the completion of all performance requirements, the contractor must demonstrate for the COR that all newly installed items under this contract are in compliance and functioning properly prior to the Government s final acceptance.
SPECIAL CONTRACTOR PROVISIONS:
Contractor Responsibilities: The contractor is responsible for verifying all site conditions prior to performing any work under this contract. The contractor is responsible for protecting building interior, adjacent structures, equipment, vehicles, pedestrians, and vegetation while performing under this contract. The contractor must be responsible for the actions of all individuals provided to work under this contract.
If in the event damages arise from work provided by contractor personnel, the contractor must be responsible for all resources necessary to remedy the incident (including damages to landscaping) at no additional cost to the Government. The contractor must adhere to all Occupational Safety and Health Administration (OSHA) regulations, as well as the safety regulations of the CVAMC while performing under this contract; see Specifications & Safety and Health During Construction.
The contractor must be responsible for ensuring that all individuals provided to work under this contract are properly licensed to operate a motor vehicle, if operating a motor vehicle on VA property is required.
Contractor Supervision and Management: Site Superintendent The Project Site Superintendent for this project shall meet the qualifications specified in Specification Section 01 45 00. The Project Superintendent shall be on site during working hours. Approval of the on-site Project Superintendent by the Contracting Officer is required prior to start of construction.
Provide resumes for the proposed on-site Project Superintendent describing their experience with references and qualifications to the Contracting Officer for approval. The Contracting Officer reserves the right to interview the proposed on-site Project Superintendent at any time in order to verify the submitted qualifications.
The Superintendent can be the Quality Control Manager Site Safety and Health Officer (SSHO) The Contractor shall provide a competent Site Safety and Health Officer (SSHO) in accordance with the requirements specified in Specification Section 01 35 26. The SSHO cannot perform the duties of the Site Superintendent. The SSHO cannot perform the duties of the QC Manager. The Contractor shall be responsible for maintaining a work site compliant with all OSHA regulations associated with the completion of the work.
Quality Control Manager (CQM) The Contractor shall implement a Quality Control Program in accordance with the requirements specified in Specification Section 01 45 00. Provide a Site QC Manager in accordance with Section 01 45 00 to manage to implement and manage the QC Program. The QC Manager cannot perform the duties of the SSHO.
The QC Manager may perform the duties of the Site Superintendent Security Requirements: Prior to the commencement of any work under this contract, upon arrival to the CVAMC, contractor personnel must first check-in with the VA Police (Building 1) to obtain a VA visitor badge. The contractor employee must be responsible for safeguarding the badge and immediately report if the badge has been lost, stolen, or destroyed to the VA Police.
Contractor personnel must properly display their employee identification badge and VA visitor badge at all times while on VA property so that their name, photo, and the company they work for can easily be seen.
Required Contractor Notifications: Contractor personnel must inform the COR of the need to gain access to secured areas. If access is required to secured areas, prearranged scheduling will be coordinated between the contractor and the COR. The contractor must coordinate all equipment shutdowns with the COR.
If work is required beyond the terms of this contract, the contractor must provide the Contracting Officer (CO) and the COR with a written cost estimate for any additional work or materials at no cost to the Government. The contractor must not perform any work or make any purchases beyond the terms of this contract without approval from the CO. Warranty: All services provided by the contractor, as well as parts replaced must come with a one (1) year warranty (minimum).
All labor, tools, supplies, transportation, and equipment associated with the replacement of warranty items must be provided by the contractor at no additional cost to the Government.
Interference in Performance Requirements: The following provisions must be adhered to by contractor personnel throughout the duration of this contract: The contractor may be required to interrupt their work at any time so as not to interfere with the normal functioning of the facility; e.g. utility services, emergency responses, the passage of facility patients/personnel, etc. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the Government.
Contractor Required Reporting: Prior to the completion of all weekly work activities, the contractor must exclusively supply the COR, with his/her company s work-documentation (daily logs). The contractor must supply the COR with any product literature and maintenance requirements for all items installed under this contract.
Cleanup and Disposal:
Housekeeping: The contractor must maintain a clean work environment, ensuring the area is free from debris after the completion of any and all services provided under this contract. If the COR finds the area where services were provided to be unacceptable, the contractor at his/her own cost must re-clean the area until acceptance is gained.
Disposal of Trash and Hazardous Waste: a. The contractor must be responsible for the removal of all trash and debris from VA property after the completion of any and all services provided under this contract. The contractor must comply with the Occupational Safety and Health Administration (OSHA), the United States Environmental Protection Agency (EPA), the Department of Transportation (DOT), State, and all other applicable regulations governing the proper handling, disposal, and removal of waste.
PERFORMANCE SCHEDULE:
Performance Start: The contractor must begin performance within 10 days of receipt of the Notice to Proceed.
Period of Performance: The contractor must complete all performance requirements within 550 days of the Notice to Proceed.
Working Hours: All work under this contract will be performed Monday through Friday (except Federal Holidays), 7:00 AM (EST) 5:30 PM (EST). Contractor may be required to work weekends due to weather or service interruptions.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- FDCD II Joint Venture, LLC
- UEI
- E66GWG1NPHL8
- CAGE
- 9CR45
- Vendor location
- Bridgeport, PA
- Contract
- 36C24425C0003, definitive contract
- Obligated
- $17,450,621.65
- Actions
- 3 between January 2, 2025 and April 30, 2026
- Competition
- Full and Open Competition After Exclusion of Sources, 4 offers received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Renovate Building 58 Domiciliary
- Match
- award number 36C24425C0003 equals the contract number; same awarding office 36C244 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 18, 2024
Special notice
Amendment 2 | Z1DA--542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Due February 2, 2024 at 5:00 PM EST. SAM.gov, notice 3a9ca5f4261b4ed498715a5e3acc8b25
December 28, 2024
Special notice
Amendment 2 | Z1DA--542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Due February 2, 2024 at 5:00 PM EST. SAM.gov, notice 5de2d303862d4cbcb6f7c0378637ea02
December 28, 2024
Presolicitation
542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Due December 20, 2023 at 5:00 PM EST. SAM.gov, notice 9e69de91c4c14979b6c6c196c25c6500
December 28, 2024
Solicitation
542-19-13 | Renovate Building 58 1st and 2nd Floors Domiciliary 100% Set-Aside for SDVOSB Contractors
Due January 5, 2024 at 5:00 PM EST. SAM.gov, notice ee5644f1537544748eede34668765994
January 2, 2025
Award notice
Awarded to FDCD II Joint Venture, LLC Bridgeport 19405 for $16,539,000. SAM.gov, notice ddef99f26a4a490387160c238eb2a03e
Points of contact
- Elizabeth Wilson, Contracting Officerelizabeth.wilson6@va.gov484-641-0594
Also open from this buyer
- Butler GP-9 NO x TestingCombined synopsis and solicitationNAICS 541380Butler, PA36C24426Q0872Closes todaySep 18
- RFQ - GI Video Integration SystemSolicitationNAICS 339112Philadelphia, PA36C24426Q0951Closes todaySep 18
- Medical Gas Preventative Maintenance and Inspection Services for Erie VA Medical CenterPresolicitationSDVOSBNAICS 81121036C24426Q0958Closes in 3 daysSep 21
- Hood Inspection and Certification for Laboratory ServicePresolicitationNAICS 541380Philadelphia, PA36C24426Q0840Closes in 3 daysSep 21
- Philadelphia VA Medical Center RadiopharmacueticalsSolicitationNAICS 325412Philadelphia, PA36C24426Q0961Closes in 3 daysSep 21