Solicitation, total small business set-aside
HAFB Storage Igloos Demolition
24-Q-0031
Department of the Army, W075 Endist Sacramento. Site Preparation Contractors.
Response deadline
April 21, 2025 at 7:30 PM EDT
Closed 559 days ago. Posted April 7, 2025. Scheduled to archive May 6, 2025.
Get the next one like this from Department of the Army by email, the day it is posted.Find my opportunities
This one closed in 2025
9 like it are open now in site preparation contractors
- Instrument Landing Structure (ILS)
Department of the Army, W076 Endist FT Worth
Sources soughtSmall businessNAICS 238910LouisianaW9126G27RA021Closes tomorrowNov 2 - Demolish Dormitory 2425
Department of the Air Force, FA4897 366 Cons PKP
Sources soughtNAICS 238910Mountain Home AFB, IDFA489727QSS11Closes in 2 daysNov 3 - Hickman Wildlife Water Catchment and Pipe Fence
Bureau of Land Management, New Mexico State Office
Combined synopsis and solicitationSmall businessNAICS 238910New Mexico140L1726Q0054Closes in 8 daysNov 9
Description
As published on SAM.gov.
USACE requires a plan to complete the removal of two (2) earth covered reinforced concrete modular Munitions Storage Magazines (MSMs) at Hill Air Force Base (HAFB), UT. These two existing buildings are numbered 1411 and 1432 and combined equal 4092 sf total. The construction type is reinforced concrete. There is a finish membrane waterproofing layer buried between the concrete structure and finish grade.
The site shall be leveled out and graded to match the existing adjacent grades in a manner that will not cause excess stormwater runoff pooling. Areas left after demolition shall be fully restored to match existing adjacent grades and vegetation specified by the reseeding requirements for Hill AFB Included in the demolition are access roads, 6” thick asphalt pavement approach aprons, lightning protection, utilities, site improvements, communication support, and all other necessary support.
Additional demolition will include, but is not limited to, the abatement/removal of asbestos containing materials (ACM) and other regulated materials (ORM), disconnect/capping of utilities, disposal of all debris materials, and restoration of the site to a specified condition. Following demolition, the Contractor shall be responsible for restoring the work site with respect to grading and proper drainage.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 7, 2025
Solicitation
Due April 21, 2025 at 7:30 PM EDT. SAM.gov, notice ba6c92e0047049329e5f66da5d41621d
Points of contact
- Jennifer FerrerJennifer.L.Ferrer@usace.army.mil
- Daniel E. Czechdaniel.e.czech@usace.army.mil