Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Sources sought

Cooling Tower, Roofing, and Structural Construction

2031ZA26B00011

Bureau of Engraving and Printing, Office of the Chief Procurement Officer. Commercial and Institutional Building Construction.

Response deadline

August 20, 2026 at 2:00 PM EDT

Closed 73 days ago. Posted August 14, 2026. Scheduled to archive September 4, 2026.

Get the next one like this from Bureau of Engraving and Printing by email, the day it is posted.Find my opportunities

This one closed in 2026

184 like it are open now in commercial and institutional building construction

All 184 open in commercial and institutional building construction

Description

As published on SAM.gov.

Seeking Sources ONLY for a design build project. Demolition and replacement of two existing Evapco cooling towers (Model: AT 424-936), replacement of one BAC cooling tower (model number is VXT-800CR from Baltimore air coil company, Serial number is 84-5979) associated structural steel platform, roofing replacement, associated structural components, associated mechanical components, associated electrical components, pump, motors, piping, chemical feed, fire/smoke detector system, condenser water motor/pumps, electrical circuit breaker, piping insulation, SCADA integration, and associated control systems.  Contractor should ensure that the project adheres to all guidelines and code, including but not limited to,  the International Plumbing Code (IPC), the American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE) standard and guideline, the American Society of Mechanical Engineers (ASME) codes and standards and the National Electrical Code, etc. The contractor shall provide As-built drawings and updated schematics for this project. The contractor shall provide an integration and SCADA commissioning, demolition, and disposal report. The contractor should provide equipment, structural, and all necessary submittals and cut sheets for all replacement components. The work shall be performed by a qualified HVAC/mechanical contractor with demonstrated experience in large-scale condenser water system installations, including the integration of cooling towers with SCADA systems. The As-built drawing needs to be accepted before the start of construction.

Please provide responses of interest to Laqulla.Williams@bep.gov. Include business size, socio-economic category (if applicable) and UEI.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 14, 2026

    Sources sought

    Due August 20, 2026 at 2:00 PM EDT. SAM.gov, notice a2635bb60687495ca795ac10b366e793

    2 revisions on SAM
    • September 16, 2026: publish, solicitation
    • August 14, 2026: publish, sources sought

Points of contact