Skip to content
Abierto

Solicitation, first published as presolicitation

Annual Maintenance for UPS, CDMX

19MX5324-Q-0045

Department of State, U.S. Embassy Mexico. Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.

Response deadline

August 30, 2024 at 2:00 PM EDT

Closed 748 days ago. Posted August 14, 2024, first published July 30, 2024. Scheduled to archive September 14, 2024.

Description

As published on SAM.gov.

The United States Embassy in Mexico City requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Uninterruptable Power Supply(s). The Contractor shall provide the labor, tools, and materials required to perform all preventive maintenance as outlined in this SOW. Embassy staff have service manuals for uninterruptable power supply on-site.

The contractor shall confirm government provided manuals are complete and current and provide the Contracting Officer’s Representative (COR) a listing of any missing or out of date manuals. The technician shall sign off on every task specified in the Statement of Work and will provide a typewritten copy of their report to the COR or the COR's designate within five business days of each maintenance visit.

The systems and components to be maintained include UPS module (s), fans, external battery module (EBM), batteries, circuit breakers, electronic module (s), wiring and auxiliary devices. The attached equipment list provides details. The contractor shall provide the COR with a list of necessary parts and materials. The contractor shall provide emergency assistance for UPS support, priced at an hourly rate, within 24 hrs of being contacted by the COR. The Government will not provide equipment for UPS testing: Multimeters, current leakage tester, power meter, megger, vacuum blower, wire stripper, wrench.

Notes: Contractor shall submit to the COR for review, work sheet/checklist that will be used for performing maintenance service. A discrepancy report shall be submitted to the COR immediately upon discovery of any condition that could result in equipment failure. The Contractor shall submit to the COR the test and inspection report within five working days after completing the work.

Additional: The contractor shall supply to post: Troubleshooting and repair manuals for UPS (s). Discrepancy reports and costs as described in paragraph IV Completed maintenance checklist for each uninterruptible power supply Applicable test and calibration reports Narrative summary of all checks findings, and conditions. Include all input and output voltage, amperage, and frequency readings.

Place of Performance: Mexico City.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 30, 2024

    Presolicitation

    Maintenance of UPS

    Due August 10, 2024 at 10:00 AM EDT. SAM.gov, notice 1d740220bd0b44028521650ce28c87d8

  2. August 14, 2024

    Solicitation

    Due August 30, 2024 at 2:00 PM EDT. SAM.gov, notice ebcbcdc01486437cabfd1479f96b5b97

Points of contact