Combined synopsis and solicitation, total small business set-aside
Replace Connex Boxes on Pier
16910Q260000003
US Coast Guard, Base New Orleans. Prefabricated Metal Building and Component Manufacturing.
Response deadline
September 8, 2026 at 4:00 PM EDT
Closed 54 days ago. Posted September 4, 2026, first published August 27, 2026. Scheduled to archive September 10, 2026.
Get the next one like this from US Coast Guard by email, the day it is posted.Find my opportunities
This one closed 54 days ago
7 like it are open now in prefabricated metal building and component manufacturing
- ROOF TARPS
Defense Logistics Agency, DLA Maritime - Puget Sound
Combined synopsis and solicitationSmall businessNAICS 332311Anywhere in the USSPMYM227Q1113Closes tomorrowNov 2 - ID-KOOSKIA NFH-FORMALIN STORAGE BLDG
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 332311Location not published140FF027Q0032Closes in 4 daysNov 5 - Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation
Department of the Army, W07V Endist Vicksburg
Combined synopsis and solicitationSmall businessNAICS 332311Anywhere in the USW912EE27QA002Closes in 5 daysNov 6
All 7 open in prefabricated metal building and component manufacturing
Description
As published on SAM.gov.
Statement of Work (SOW)
Supply and Delivery of Connex Storage Containers
U.S. Coast Guard Cutter AXE
Morgan City, Louisiana
PART 1: GENERAL
Intent
The United States Coast Guard requires the procurement and delivery of conex (shipping container) storage units with specified modifications to support operational storage requirements at USCGC AXE, Morgan City, Louisiana.
Scope of Work
The Contractor shall furnish, modify, and deliver conex storage containers in accordance with the specifications outlined in this Statement of Work. Modifications include electrical systems, insulation, ventilation, personnel access, and climate control components. No alterations outside of this Statement of Work are authorized without approval from the Contracting Officer (KO) or Contracting Officer’s Representative (COR). All equipment shall be fully functional upon delivery and ready for immediate use.
Delivery Location
USCGC AXE
800 Youngs Road
Morgan City, LA 70380
Continuity of Operations
Deliveries shall be scheduled to minimize interference with unit operations. Deliveries shall occur between 8:00 AM – 4:00 PM, Monday through Friday (excluding federal holidays), unless otherwise approved by the KO or COR.
Government Furnished Materials
None.
Government Facilities and Utilities
None.
Safety
The Contractor is responsible for all safety measures during delivery and placement and shall comply with OSHA regulations (29 CFR 1910 and 1926) and all applicable federal, state, and local laws.
Environmental Compliance
All work shall comply with the Resource Conservation and Recovery Act (RCRA) and all applicable environmental laws. No discharge to storm drains is permitted. All waste must be removed from the site daily.
Site Visit
Site visits are not required.
Point of Contact (POC)
USCGC AXE Representative
BMCS Bosman
906-203-7519
PART 2: PERFORMANCE REQUIREMENTS
General Requirements
Contractor shall supply and deliver conex containers with configurations and modifications as specified below.
40-Foot High Cube Containers (Modified)
Quantity: 5
Each unit shall include:
- Dimensions: 40’ L x 8’ W x 9’6” H High Cube
- Condition: New / One-time use
Interior Buildout:
- Framed interior (2x4 construction)
- Insulated with approximately 2” rigid foam board
- Finished with 3/8” plywood
Electrical System:
- External mounted conduit
- LED industrial lighting (minimum 4 fixtures)
- Circuit breaker load center
- 110V receptacles (minimum 4)
- Light switch
- 110V or 220V receptacle
Climate Control:
- Fabricated AC opening with reinforced steel frame
- Window AC unit (10,000–12,000 BTU, 110V)
Access:
- Steel personnel door with weather stripping, threshold, deadbolt, and drip cap
20-Foot Containers (Modified)
Quantity: 1
Each unit shall include:
- Dimensions: 20’ L x 8’ W x 8’6” H
- Condition: New / One-time use
Interior Buildout:
- Framed and insulated construction
Electrical System:
- LED lighting (minimum 2 fixtures)
- Circuit breaker load center
- 110V receptacles (minimum 2)
- Light switch
Ventilation:
- Door-mounted vents
- Sidewall vents
Delivery Requirements
Contractor shall deliver containers to USCGC AXE. Final placement will be performed by the Government. Contractor shall coordinate delivery timing with the COR prior to arrival.
Contract Timeline
- Submittals due within 14 calendar days of award
- Government review: 7 calendar days
- Contractor shall provide delivery schedule within 14 days of award
- Delivery timeline shall be coordinated with COR
Submittals
Contractor shall provide:
- Manufacturer specifications
- Electrical documentation
- Warranty information
Warranty
Contractor shall provide manufacturer standard warranties for all equipment and modifications.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- USCGC.AXE.ConnexSOW.docx30 KB, August 27, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 27, 2026
Combined synopsis and solicitation
Due September 8, 2026 at 4:00 PM EDT. SAM.gov, notice 2873cb35d6334622aacc694377c16741
2 revisions on SAM
- September 4, 2026: publish, combined synopsis and solicitation
- August 27, 2026: publish, combined synopsis and solicitation
September 4, 2026
Combined synopsis and solicitation
Due September 8, 2026 at 4:00 PM EDT. SAM.gov, notice 14db81c95f5246b4934a317bad8b55c4
2 revisions on SAM
- September 4, 2026: publish, combined synopsis and solicitation
- August 27, 2026: publish, combined synopsis and solicitation
Points of contact
- Clarence Henshaw Jrclarence.henshawjr@uscg.mil5042534509
- Belinda A Robinsonbelinda.a.robinson@uscg.mil2068153366