Skip to content
  • 6,813 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Award notice, total small business set-aside, first published as combined synopsis and solicitation

FCI Greenville Cooling Tower Rental

15B40024Q000000CS1

Federal Prison System / Bureau of Prisons, Ncro. Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment Manufacturing.

Awarded

FEDERAL CONTRACTS Corp. Tampa

Amount not published

Get the next one like this from Federal Prison System / Bureau of Prisons by email, the day it is posted.Find my opportunities

This one was awarded in 2024

45 like it are open now in air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing

  • 36C25227Q0048 - COOLERS AND FREEZER

    Department of Veterans Affairs, 252-Network Contract Office 12

    Combined synopsis and solicitationSDVOSB sole sourceNAICS 333415Anywhere in the US36C25227Q00480001
    Closes in 5 daysNov 6
  • FCC TERRE HAUTE Heating Condensate Pumps

    Federal Prison System / Bureau of Prisons, Usp Terre Haute

    Combined synopsis and solicitationSmall businessNAICS 333415Anywhere in the US15B41826Q00000005
    Closes tomorrowNov 2
  • CHILLER

    Defense Logistics Agency, Sprmm1 DLA Mechanicsburg

    SolicitationNAICS 333415Anywhere in the USSPRMM126QKJ20
    Closes tomorrowNov 2

All 45 open in air-conditioning and warm air heating equipment and commercial and industrial refrigeration equipment manufacturing

Description

As published on SAM.gov with the combined synopsis and solicitation of February 2, 2024.

This is for a firm fixed price contract, which consists of sourcing, delivery, and monthly rental of two 500-ton cooling towers, they must be capable to operate off two 400-amp electrical services. These are to be delivered to FCI Greenville Illinois. Your quote must include (at a minimum) the following:

1) Specification of each item quoted 2) Price per unit of each item 2a)Rental price per unit must be no longer than 1 week Award will be based on a best value trade off determination in which price, specifications, past performance, and will be reviewed. Please see the attachments for detailed requirements. Pictures added 2/2/2024 Questions: Approximately how much pipe and wire are estimated to be provided by the contractor?

This is an estimate only, but approximately 50 feet of pipe and approximately 100 feet of wire. Approximate Gallons Per Minute? 3000gpm Are pumps needed to be provided? We have pumps on site. Is the drain a sump? Yes, you will be draining into a sump. Distance to electrical and piping connections? This is an estimate only, but approximately 50 feet of pipe and approximately 100 feet of wire. Pipe Connection Size? 8-inch piping connections. How many tons? 1000 tons of cooling capacity. Inlet and outlet temps?

Inlet 85-90°F, Outlet 70-75°F What is the application? To work with two 500-ton chillers to cool a prison facility while permanent chillers are installed. Available power for these units? Two 400-amp electrical service connections will be provided. Have source for makeup water? Yes, a source for make-up water is available. Would a single 1,000-ton unit be acceptable in place of two 500-ton units?

If a 1000-ton unit has a similar footprint and is able to make 8-inch water connections and operate off two 400-amp electrical services that would be acceptable. Are the (2) 500-ton cooling towers going to be used on one common condenser loop or separate condenser loops? The two cooling towers will work with one chilled water loop. Will facility do the final electrical or water connection or it the responsibility of the contractor?

It is the responsibility of the contractor to make electrical and water connections (our maintenance dept can make final electrical connections at the service box). All water connections must be made by contractor.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 26, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice 9eb388d52fa64ab3a7192fc1d3e14aeb

  2. January 30, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice 4ea1b781a2c54f0f9eb8bff961f44df3

  3. January 31, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice 2a68e786db4d4b34b113c103d998f510

  4. January 31, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice ef599c5b85d74540bd072724e91c09af

  5. February 2, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice 8b956337ba8b4119a7ef8415bd5deaba

  6. February 2, 2024

    Combined synopsis and solicitation

    Due February 9, 2024 at 11:00 AM EST. SAM.gov, notice c0f7fb0910434d68a5617ea01cc58c2f

  7. February 21, 2024

    Award notice, originally combined synopsis and solicitation

    Awarded to FEDERAL CONTRACTS Corp. Tampa for $71,020. SAM.gov, notice 4e2f8ec74bab4bfea008760c7ab24b8e

Points of contact