Solicitation, total small business set-aside
Backflow, valves and chiller replacements
15A00025Q00000111
ATF Acquisition and Property MGMT Div, ATF | Acquisitions Management Division. Plumbing, Heating, and Air-Conditioning Contractors.
Awarded
$65,800.00 obligated so far on USAspending
Description
As published on SAM.gov.
The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services: Backflow Preventors Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP Main Gate Valves Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.
NOTE-This work will need to be completed during off hours. Chiller Pipe Replacement Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. Install 2 new thread-o-lets, plug one off and connect the new chemical line. Replace the schedule 80 PVC all the way back to the ball valve with new split rings.
Leak checked to be performed and monitored by building engineers for 24 hours before insulating Install new insulation and wrapping over new pipe and tie into existing. The plastic vinyl 90's may be reused if not damaged during removal The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe. Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Arabic Interpreters LLC
- UEI
- ZJ1CQPM452X3
- CAGE
- 9YQF6
- Vendor location
- Arlington, TX
- Contract
- 15A00025PAQA00281, purchase order
- Obligated
- $65,800.00
- Actions
- 1 between September 24, 2025 and September 24, 2025
- Competition
- Competed Under SAP, 5 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- This Award Is for the Back-Flows, Valves, Chiller Pipe Replacement.
- Match
- solicitation number 15A00025Q00000111 equals the FPDS solicitation identifier; same awarding office 15A000 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 5, 2025
Solicitation
Due September 11, 2025 at 2:59 PM EDT. SAM.gov, notice 9b4711380b7947359814a8c48225ff4f
September 5, 2025
Solicitation
Due September 11, 2025 at 2:59 PM EDT. SAM.gov, notice f534d0f1a3e04734833bc1938432f26d
September 9, 2025
Solicitation
Due September 11, 2025 at 2:59 PM EDT. SAM.gov, notice 242fb8d9127e4740ad2b8f41af24d2b5
September 12, 2025
Solicitation
Due September 16, 2025 at 3:00 PM EDT. SAM.gov, notice dcf24ed559c8412393a7d32c6c20eef9
September 16, 2025
Solicitation
Due September 16, 2025 at 3:00 PM EDT. SAM.gov, notice ac029377f1404034b4642883b6eb8991
Points of contact
- Brandon HodnettBrandon.Hodnett@atf.gov
Also open from this buyer
- Field, Background-Investigative ServicesCombined synopsis and solicitationSmall businessNAICS 56161115A00025R00000040Closes in 1361 daysJun 10, 2030
- Field, Background-Investigative Services (Multiple Award)Combined synopsis and solicitationSmall businessNAICS 56161115A00025Q00000069Closes in 1366 daysJun 15, 2030