# Backflow, valves and chiller replacements

Canonical: https://abierto.us/opportunities/15a00025q00000111

- Solicitation number: 15A00025Q00000111
- Notice type: Solicitation
- Status: Awarded to Arabic Interpreters LLC
- Department: Department of Justice
- Agency: ATF Acquisition and Property MGMT Div
- Contracting office: ATF | Acquisitions Management Division (15A000)
- NAICS: 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Product or service code: Z1AA Maintenance Of Office Buildings
- Set-aside: Total small business set-aside
- Place of performance: Beltsville, Maryland
- County: Prince George's County (FIPS 24033). https://abierto.us/counties/prince-george-s-county-md-24033
- City: Beltsville. https://abierto.us/cities/beltsville-md-2406400
- First posted: September 5, 2025
- Last posted: September 16, 2025
- SAM.gov: https://sam.gov/workspace/contract/opp/ac029377f1404034b4642883b6eb8991/view

## Description

The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services: Backflow Preventors Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP Main Gate Valves Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.

NOTE-This work will need to be completed during off hours. Chiller Pipe Replacement Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room. Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line. Install 2 new thread-o-lets, plug one off and connect the new chemical line. Replace the schedule 80 PVC all the way back to the ball valve with new split rings.

Leak checked to be performed and monitored by building engineers for 24 hours before insulating Install new insulation and wrapping over new pipe and tie into existing. The plastic vinyl 90's may be reused if not damaged during removal The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe. Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.

## Award on USAspending

- Recipient: Arabic Interpreters LLC (UEI ZJ1CQPM452X3)
- Contract: 15A00025PAQA00281, purchase order
- Obligated: $65,800.00
- Competition: Competed Under SAP, 5 offers received
- Link: solicitation number 15A00025Q00000111 equals the FPDS solicitation identifier; same awarding office 15A000 (high confidence)
- Record: https://www.usaspending.gov/award/CONT_AWD_15A00025PAQA00281_1560_-NONE-_-NONE-/


## Publications

- September 5, 2025: Solicitation, due September 11, 2025 at 2:59 PM EDT. Notice 9b4711380b7947359814a8c48225ff4f. https://sam.gov/workspace/contract/opp/9b4711380b7947359814a8c48225ff4f/view
- September 5, 2025: Solicitation, due September 11, 2025 at 2:59 PM EDT. Notice f534d0f1a3e04734833bc1938432f26d. https://sam.gov/workspace/contract/opp/f534d0f1a3e04734833bc1938432f26d/view
- September 9, 2025: Solicitation, due September 11, 2025 at 2:59 PM EDT. Notice 242fb8d9127e4740ad2b8f41af24d2b5. https://sam.gov/workspace/contract/opp/242fb8d9127e4740ad2b8f41af24d2b5/view
- September 12, 2025: Solicitation, due September 16, 2025 at 3:00 PM EDT. Notice dcf24ed559c8412393a7d32c6c20eef9. https://sam.gov/workspace/contract/opp/dcf24ed559c8412393a7d32c6c20eef9/view
- September 16, 2025: Solicitation, due September 16, 2025 at 3:00 PM EDT. Notice ac029377f1404034b4642883b6eb8991. https://sam.gov/workspace/contract/opp/ac029377f1404034b4642883b6eb8991/view