Skip to content
Abierto

Solicitation, total small business set-aside

BLM-CO TRFO BASIN WELL AND WATER SYSTEM

140L1726R0005

Bureau of Land Management, Colorado State Office. Water and Sewer Line and Related Structures Construction.

Offers due

September 17, 2026 at 10:00 AM EDT

That is tomorrow. Posted September 3, 2026, first published August 28, 2026.

Description

As published on SAM.gov.

BLM-CO TRFO BASIN WELL AND WATER SYSTEM IMPROVEMENTS AMENDMENT 3 (09/03/2026)- This amendment is to add Q&A. This solicitation is being amended to reopened to change the set aside to 100% Total Small Business due to original set-aside resulting in no responses, post it to open market (SAM.gov), update terms and conditions, and adding attachments. All questions are due by September 14, 2026 8am MD.

This is a solicitation announcement for well improvements of a well house located at the Bureau of Land Management TRFO Basin Well, Montrose County, Colorado near Naturita, CO. 1.1 PROJECT DESCRIPTION Contractor shall provide a turnkey solar powered, well water system that automatically provides and maintains water to a wildlife drinking tank with minimal human input except winterization and annual maintenance. System shall be designed to have a solar pumping system at an existing water well.

Provide water to an elevated buried storage tank. The buried storage tank will gravity feed the drinking tank. An additional tee and valve shall be provided for a future upgrade for a stockwater tank. System shall be designed to be freeze proof and operational in the winter to the frost free hydrant at the drinking tank.

1.2 LOCATION Latitude:

38.06529167° N Longitude: -108.63154723° W From Naturita, CO. Travel south on CO-141 for approximately 12 miles. Turn right (west) on County Road U29. Travel approximately 5 miles. The project is on the left (south). 1.3 WORK SCHEDULE Work shall be completed within 360 days of the Notice to Proceed. Contractor shall complete all work within 360 days of starting work. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site.

Period of Performance: Work shall be completed within 360 days of the Notice to Proceed.

Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please.

Free assistance is available at your local APEX Accelerators - https://www.apexaccelerators.us/#/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 12- Acquisition of Commercial Products and Commercial Services 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Montrose County, CO 6. Total Small Business Set-Aside for NAICS 237110 -Water and Sewer Line and Related Structures Construction $45 7. Bid, Performance and Payment Bonding maybe required 8. Type of Contract - Firm Fixed Price 9. Basis of Award -Best value Primary POC: Contracting Specialist Courtni Strickland cstrickland@ios.doi.gov

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 28, 2026

    Solicitation

    Due September 9, 2026 at 2:00 PM EDT. SAM.gov, notice 6fdc6d0a1a0344cdb851a1252e99d0af

  2. August 28, 2026

    Solicitation

    Due September 9, 2026 at 2:00 PM EDT. SAM.gov, notice e6b0be7d165d4af29c632bb1b39a4247

  3. September 2, 2026

    Solicitation

    Due September 17, 2026 at 10:00 AM EDT. SAM.gov, notice 998af791aee444d9ac3de86f23cf7284

  4. September 3, 2026

    Solicitation

    Due September 17, 2026 at 10:00 AM EDT. SAM.gov, notice eaaa66d074ba4617b12fc99e0d0bd86b

Points of contact