Award notice, total small business set-aside, first published as combined synopsis and solicitation
Pavement Repair
12639526Q0110
Animal and Plant Health Inspection Service, MRPBS Minneapolis MN. Highway, Street, and Bridge Construction.
Awarded
Construction Solutions Group, LLC
$668,528.00 obligated so far on USAspending
Get the next one like this from Animal and Plant Health Inspection Service by email, the day it is posted.Find my opportunities
This one was awarded in 2026
36 like it are open now in highway, street, and bridge construction
- GRSM 321788 - Oconaluftee River Trail
Departmental Offices, National Park Service Contracting Activity
Sources soughtNAICS 237310Tennessee140PP027R0011Closes in 11 daysNov 12 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3
Description
As published on SAM.gov with the combined synopsis and solicitation of May 19, 2026.
The entire paved area at the Memphis Cotton Classing Facility is in a severe state of disrepair and must be replaced. The surfaces were first paved in 1995. There is poor drainage and water intrusion to the subbase, leading to severe degradation.
Solicitation documents are posted below.
Amendment 1 is posted below.
Regarding amendment 1 incorporating pavement striping, acrylic paint is required, and the striping should match existing.
RFIs:
- Can you provide the dimensions of the sink hole that was covered and how you would like to fill it? See photos below for dimensions. Clear the hole, dig out the debris, fill with appropriate material (ie, 3/4 “ gravel), asphalt with back lot.
- With this being in 3 phases, will the project require 3 mobilizations? Depending on the necessary schedule, yes it may.
RFI:
Is the intent of this project to preserve as much of the subgrade as possible? Or is the intent to replace the entire subgrade?
The intent is to preserve where it can be preserved and replace where necessary to provide a parking area that does not retain water, drains properly, and is appropriately sloped. While at the same time having a finished parking lot that will not deteriorate prematurely due to subgrade preservation. Preserve it to the extent it makes sense to do so. There is no specific requirement to replace it all.
Additionally, fog seal is not required.
Amendment 2 is posted below. The closing date for quotes is extended to May 29.
Amendment 3 is posted below
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- 12639526Q0110.docx76 KB, April 17, 2026
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Construction Solutions Group, LLC
- UEI
- MAABCKNLHTB5
- CAGE
- 6URP3
- Vendor location
- Saint Louis, MO
- Contract
- 12639526P0164, purchase order
- Obligated
- $668,528.00
- Actions
- 4 between June 17, 2026 and August 28, 2026
- Competition
- Competed Under SAP, 10 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Pavement Repair
- Match
- award number 12639526P0164 equals the contract number; same awarding office 126395 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 17, 2026
Combined synopsis and solicitation
Due May 15, 2026 at 1:00 PM EDT. SAM.gov, notice 19f682c6feaa4648af4858de581b2028
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
April 21, 2026
Combined synopsis and solicitation
Due May 15, 2026 at 1:00 PM EDT. SAM.gov, notice c26c734070f548fe90de477aa07b5bff
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
April 22, 2026
Combined synopsis and solicitation
Due May 15, 2026 at 1:00 PM EDT. SAM.gov, notice a0d5f718f6d14a92a79d0ca08b4b8c6f
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
May 4, 2026
Combined synopsis and solicitation
Due May 15, 2026 at 1:00 PM EDT. SAM.gov, notice a5eec2b6c81f490895f94fe19990b64a
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
May 14, 2026
Combined synopsis and solicitation
Due May 15, 2026 at 1:00 PM EDT. SAM.gov, notice 5e46f207b9544553a8fbb2997bbee7c6
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
May 15, 2026
Combined synopsis and solicitation
Due May 29, 2026 at 1:00 PM EDT. SAM.gov, notice 8b1d33b9881a480e90b6e226f815cb98
7 revisions on SAM
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
May 19, 2026
Combined synopsis and solicitation
Due June 2, 2026 at 1:00 PM EDT. SAM.gov, notice d1e40886d89f448aae12568a0251f795
8 revisions on SAM
- June 18, 2026: publish, award notice
- May 19, 2026: publish, combined synopsis and solicitation
- May 15, 2026: publish, combined synopsis and solicitation
- May 14, 2026: publish, combined synopsis and solicitation
- May 4, 2026: publish, combined synopsis and solicitation
- April 22, 2026: publish, combined synopsis and solicitation
- April 21, 2026: publish, combined synopsis and solicitation
- April 17, 2026: publish, combined synopsis and solicitation
June 18, 2026
Award notice, originally combined synopsis and solicitation
Awarded to Construction Solutions Group, LLC for $649,000. SAM.gov, notice c54f9bc62e504de7bf38482ca98b0d66
2 revisions on SAM
- June 18, 2026: publish, award notice
- May 19, 2026: publish, combined synopsis and solicitation
Points of contact
- Jim Roloffjames.g.roloff@usda.gov6125907603