Award notice, total small business set-aside, first published as solicitation
Superior National Forest Bridge Repair
12445525Q0004
Forest Service, Usda-Fs, Csa East 13. Highway, Street, and Bridge Construction.
Awarded
$30,800.00 on the award notice, December 17, 2024, contract 12445525P0005
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one was awarded in 2024
36 like it are open now in highway, street, and bridge construction
- FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3 - TX FW LGA 10(5) Steve Thompson Wildlife Drive
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Los Fresnos, TX6982AF27B000006Closes in 2 daysNov 3
Description
As published on SAM.gov.
. This is a total small business set-aside under NAICS Code 237310, size standard $45M. The magnatude of this project is between $25,000 and $100,000. The Cloquet River Bridge is located on Forest Road 122 in Township 56N, Range 12W, Section 25 (47.3099N, 91.7964W) in St Louis County MN. The Cloquet River Bridge constructed in 1957, is 67 years old two span continuous concrete beam bridge with a center pier. Seasonal peak flow in the Cloquet River is typically between 1000-2000cfs.
The June 18, 2024 Storm Event caused a peak flow of around 6000 cfs. The flooding appears to have overtopped road and bridge as the bridge deck was washed clean and there is debris on the road shoulder at bridge ends. There is major degradation and scour of the riverbed. There was a debris jam on the pier nose. A dive investigation found severe scour at the pier. The center pier footer is completely undermined for about 2/3 of it's length. (See attached undermining sketch.)
It is assumed that the reinforced concrete superstructure (continuous over the pier) is currently supporting the pier from rotating into the scour hole. Without repairing the undermining prior to spring flows, it is feared the scour will increase and the bridge will collapse. This project is intended stabilize the bridge until a replacement bridge can be funded, designed and constructed. The bridge is currently closed to all traffic and will remain closed to all traffic upon completion of the work
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Mayointhemix LLC
- UEI
- TQ4VLMJTDL73
- CAGE
- 9TFK1
- Vendor location
- Upper Marlboro, MD
- Contract
- 12445525P0005, purchase order
- Obligated
- $30,800.00
- Actions
- 1 between December 17, 2024 and December 17, 2024
- Competition
- Full and Open Competition After Exclusion of Sources, 20 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Emergency Repairs on the Cloquet River Bridge
- Match
- award number 12445525P0005 equals the contract number; same awarding office 124455 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Clark A. Barteltclark.a.bartelt@usda.gov2184098332
- Brad Higleybradley.higley@usda.gov