Combined synopsis and solicitation, total small business set-aside
Deschutes National Forest Belly Dump Trailer Reconditioning
1240BE26Q0108
Forest Service, Deschutes National Forest. Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance.
Offers due
September 17, 2026 at 3:00 PM EDT
That is tomorrow. Posted September 14, 2026, first published September 3, 2026.
Description
As published on SAM.gov.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240BE26Q0108 is issued as a Request for Quotation (RFQ) for complete reconditioning of two belly dump trailers.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 811310 The small business size standard is $12.5 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Statement of Requirement
The Government requires the complete reconditioning of two belly dump trailers. Work includes full structural refurbishment, replacement of critical mechanical systems, and complete modernization of electrical, air, and safety components. Both trailers will undergo full frame inspection and reinforcement, including crack repair, straightening, and replacement or fabrication of structural
elements such as crossmembers and push blocks.
The requirement includes full suspension and axle replacement, installation of a new kingpin and upper coupler components (if needed), and a complete electrical and air system overhaul from front to back. The trailers’ hopper and gate systems will be rebuilt, including installation of a new AR liner, rebushed hinges, and new cylinders.
Both trailers will receive new hardware throughout, updated safety equipment, a new landing gear assembly, and a new fender and mudflap system. Additionally, each trailer will be fitted with new wheels and tires.
Finally, both trailers must undergo a complete sandblast, surface preparation, priming, and repainting process to restore protective coatings and ensure long‑term durability. All work must return the trailers to safe, reliable, and fully operational condition suitable for continued service.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- C04_1240BE26Q0108_Commerical Products and Services.pdf4.5 MB, September 3, 2026, mirrored
- C05_Amd0001_1240BE26Q0108.pdf223 KB, September 4, 2026, mirrored
- C05_Amd0002_1240BE26Q0108.pdf.pdf13.0 MB, September 14, 2026, mirrored
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 3, 2026
Combined synopsis and solicitation
Due September 15, 2026 at 3:00 PM EDT. SAM.gov, notice b791c9221936452bb2a54faed7744648
September 4, 2026
Combined synopsis and solicitation
Due September 15, 2026 at 3:00 PM EDT. SAM.gov, notice edc32bdf7cea40358e6329d86f28a5a5
September 14, 2026
Combined synopsis and solicitation
Due September 17, 2026 at 3:00 PM EDT. SAM.gov, notice 0796e5cc96f04dccaaf9387885c8b47b
3 revisions on SAM
- September 14, 2026: publish, combined synopsis and solicitation
- September 4, 2026: publish, combined synopsis and solicitation
- September 3, 2026: publish, combined synopsis and solicitation
Points of contact
- Andrea Pollockandrea.pollock@usda.gov