Sources sought, 8(a) set-aside
Renovate Marshall Gulch Picnic Area & Trailhead
1148960
Forest Service, Usda-Fs, Csa Southwest 7. Highway, Street, and Bridge Construction.
Response deadline
July 8, 2025 at 12:00 PM EDT
Closed 481 days ago. Posted June 24, 2025. Scheduled to archive July 23, 2025.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2025
36 like it are open now in highway, street, and bridge construction
- AZ BL COLO 7528(1) Burro Creek Road
Federal Highway Administration, 6982AF Central Federal Lands Divisi
SolicitationSmall businessNAICS 237310Kingman, AZ6982AF27B000002Closes in 16 daysNov 17 - FY27 NRM - Correct Mather Loop Road and Install Speed Bumps
Department of Veterans Affairs, 261-Network Contract Office 21
Sources soughtNAICS 237310Mather, CA36C26127Q0112Closes tomorrowNov 2 - BRCA 310427 Southbound Shuttle Stop
National Park Service, DSC Contracting Services Division
SolicitationNAICS 237310Utah140P2026R0065Closes in 2 daysNov 3
Description
As published on SAM.gov.
WorkWork primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 24, 2025
Sources sought
Due July 8, 2025 at 12:00 PM EDT. SAM.gov, notice bc407e0dcbdb405ca78210a431c5afce
Points of contact
- Troy A. McCulloughtroy.mccullough@usda.gov
- Blaine Greenwaltblaine.greenwalt@usda.gov